A

County Cavan

About 40,000 homes and businesses · estimated from Census 2022

Month by month

MonthGradeRestored in 4hRestored by first estimateFaultsOver 24 hPlannedCustomers hitMinutes lost
November 2026to 11 NovA100%90.9%110241,3281.0
October 2026B93.9%77.8%6205427,36843.4
September 2026A97.2%57.1%150533,0268.1
August 2026A96.1%70.8%270497,3498.2
July 2026from 31 Jul–––00000.0

Only part of July 2026 was watched, so it is not graded.

Where faults keep happening · since 31 July 2026

The places ESB names on its faults, counted over every month. A name can sit in more than one Census area, so these are not the areas listed below.

Outage history · 294 outages

This list as a CSV file, one row per outage, times in UTC.

CavanPlanned · supply quality
156 customers affected · began Wed 11 Nov, 10:16 · scheduled until 17:00 (6 h 44 min) · still listed when last checked
ErrigalPlanned · supply quality
23 customers affected · began Wed 11 Nov, 10:03 · scheduled until 17:00 (6 h 57 min) · still listed when last checked
DerrycramphPlanned · network upgrade
34 customers affected · began Wed 11 Nov, 10:00 · scheduled until 17:00 (7 h) · still listed when last checked
CavanFault
970 customers affected · began Wed 11 Nov, 08:34 · restored 08:43 (9 min) · 1 h 17 min earlier than ESB estimated
FineaFault
11 customers affected · began Tue 10 Nov, 18:01 · restored 20:09 (2 h 8 min) · 6 min earlier than ESB estimated
CavanPlanned · supply quality
46 customers affected · began Tue 10 Nov, 14:22 · listed for about 2 h · no end time published
ErrigalPlanned · supply quality
114 customers affected · began Tue 10 Nov, 11:02 · listed for about 3 h 30 min · no end time published
CavanPlanned · network upgrade
30 customers affected · began Tue 10 Nov, 10:05 · scheduled until 17:00 (6 h 55 min)
OldcastleFault
39 customers affected · began Tue 10 Nov, 08:37 · restored 10:01 (1 h 24 min) · 14 min earlier than ESB estimated
KingscourtPlanned · supply quality
104 customers affected · began Tue 10 Nov, 08:19 · listed for about 30 min · no end time published
FineaPlanned · network upgrade
10 customers affected · began Mon 9 Nov, 12:19 · listed for about 3 h 30 min · no end time published
CavanPlanned · network upgrade
35 customers affected · began Mon 9 Nov, 11:14 · listed for about 2 h 30 min · no end time published
CavanPlanned · network upgrade
169 customers affected · began Mon 9 Nov, 10:03 · listed for about 5 h 30 min · no end time published
DerrycramphFault
20 customers affected · began Sun 8 Nov, 20:13 · restored 21:41 (1 h 28 min) · 1 h 4 min earlier than ESB estimated
CavanFault
11 customers affected · began Fri 6 Nov, 12:35 · restored 13:45 (1 h 10 min) · 2 h earlier than ESB estimated
BallyjamesduffPlanned · new connections
48 customers affected · began Fri 6 Nov, 10:21 · listed for about 1 h 30 min · no end time published
DerrycramphPlanned · network upgrade
94 customers affected · began Fri 6 Nov, 10:00 · listed for about 4 h 30 min · no end time published
BallyjamesduffFault
81 customers affected · began Fri 6 Nov, 09:52 · restored 11:10 (1 h 18 min) · 1 h 20 min earlier than ESB estimated
  • Outage began · 59 customers
  • 81 customers still off
  • Supply restored
BallyconnellFault
36 customers affected · began Thu 5 Nov, 17:05 · restored 18:11 (1 h 6 min) · 49 min earlier than ESB estimated
FineaFault
18 customers affected · began Thu 5 Nov, 13:44 · restored 15:28 (1 h 44 min) · 1 h 2 min earlier than ESB estimated
BallyjamesduffPlanned · new connections
79 customers affected · began Thu 5 Nov, 10:39 · listed for about 4 h 30 min · no end time published
BallyconnellPlanned · network upgrade
42 customers affected · began Thu 5 Nov, 10:04 · listed for about 5 h · no end time published
CavanPlanned · supply quality
43 customers affected · began Thu 5 Nov, 09:43 · listed for about 6 h 30 min · no end time published
DerrycramphPlanned · network upgrade
71 customers affected · began Thu 5 Nov, 09:42 · listed for about 6 h · no end time published
CavanFault
84 customers affected · began Wed 4 Nov, 16:40 · restored 17:57 (1 h 17 min) · 1 h 18 min earlier than ESB estimated
DerrycramphFault
24 customers affected · began Wed 4 Nov, 13:01 · restored 14:56 (1 h 55 min) · 49 min earlier than ESB estimated
CavanPlanned · network upgrade
181 customers affected · began Wed 4 Nov, 10:20 · scheduled until 17:30 (7 h 10 min)
CavanFault
34 customers affected · began Wed 4 Nov, 09:20 · restored 11:49 (2 h 29 min) · 1 h 26 min earlier than ESB estimated
ShercockPlanned · new connections
87 customers affected · began Tue 3 Nov, 10:41 · listed for about 4 h · no end time published
VirginiaPlanned · supply quality
67 customers affected · began Tue 3 Nov, 10:24 · listed for about 5 h 30 min · no end time published
ErrigalPlanned · new connections
21 customers affected · began Tue 3 Nov, 10:10 · listed for about 4 h · no end time published
FineaPlanned · new connections
65 customers affected · began Mon 2 Nov, 11:44 · listed for about 4 h 30 min · no end time published
CavanPlanned · supply quality
15 customers affected · began Mon 2 Nov, 10:39 · scheduled until 17:00 (6 h 21 min)
BallyjamesduffPlanned · supply quality
166 customers affected · began Mon 2 Nov, 09:56 · listed for about 6 h · no end time published
CavanPlanned · network upgrade
30 customers affected · began Mon 2 Nov, 09:33 · listed for about 5 h 30 min · no end time published
BallyjamesduffPlanned · supply quality
10 customers affected · began Thu 29 Oct, 09:52 · listed for about 3 h 30 min · no end time published
BallyconnellPlanned · network upgrade
313 customers affected · began Thu 29 Oct, 09:02 · listed for about 7 h 30 min · no end time published
BallyjamesduffPlanned · new connections
38 customers affected · began Wed 28 Oct, 11:18 · listed for about 2 h · no end time published
CavanPlanned · network upgrade
276 customers affected · began Wed 28 Oct, 10:13 · listed for about 4 h 30 min · no end time published
CavanPlanned · supply quality
18 customers affected · began Wed 28 Oct, 09:47 · scheduled until 17:00 (7 h 13 min)
BallyjamesduffPlanned · network upgrade
146 customers affected · began Tue 27 Oct, 11:41 · listed for about 4 h 30 min · no end time published
BallyjamesduffPlanned · supply quality
26 customers affected · began Tue 27 Oct, 11:20 · listed for about 5 h · no end time published
CavanPlanned · supply quality
28 customers affected · began Tue 27 Oct, 10:16 · listed for about 5 h 30 min · no end time published
CavanFault
54 customers affected · began Tue 27 Oct, 10:08 · restored 10:29 (21 min) · 2 h 16 min earlier than ESB estimated
MullaghPlanned · network upgrade
50 customers affected · began Tue 27 Oct, 09:55 · scheduled until 17:00 (7 h 5 min)
ErrigalPlanned · supply quality
10 customers affected · began Tue 27 Oct, 09:46 · listed for about 4 h · no end time published
CavanFault
48 customers affected · began Tue 27 Oct, 09:31 · restored 16:16 (6 h 45 min) · 4 h 46 min later than ESB estimated
BailieboroFault
21 customers affected · began Mon 26 Oct, 12:52 · restored 14:45 (1 h 53 min) · 45 min earlier than ESB estimated
BailieboroFault
41 customers affected · began Mon 26 Oct, 12:49 · restored 14:45 (1 h 56 min) · 45 min earlier than ESB estimated
BallyconnellFault
14 customers affected · began Mon 26 Oct, 07:34 · restored 15:13 (7 h 39 min) · 13 min later than ESB estimated
BallyconnellFault
1,291 customers affected · began Sun 25 Oct, 13:55 · restored 14:08 (13 min) · 52 min earlier than ESB estimated
CavanFault
1,341 customers affected · began Sun 25 Oct, 13:55 · restored 16:26 (2 h 31 min)
  • Outage began · 1,341 customers
  • 2 further updates
    • 81 customers still off
    • 24 customers still off
  • Supply restored
CavanFault
868 customers affected · began Sun 25 Oct, 13:54 · restored 14:05 (11 min) · 55 min earlier than ESB estimated
MullaghFault
30 customers affected · began Sun 25 Oct, 12:21 · restored 14:12 (1 h 51 min)
Repeat fault - outage 2 of 2 at this location in quick succession
CavanFault
32 customers affected · began Sun 25 Oct, 11:09 · restored 12:06 (57 min) · 1 h 9 min earlier than ESB estimated
MullaghFault
30 customers affected · began Sun 25 Oct, 09:51 · restored 12:20 (2 h 29 min) · 1 h 40 min earlier than ESB estimated
Repeat fault - outage 1 of 2 at this location in quick succession
BallyjamesduffFault
723 customers affected · began Sun 25 Oct, 09:16 · restored 12:25 (3 h 9 min) · 1 h 35 min earlier than ESB estimated
  • Outage began · 723 customers
  • 2 further updates
    • 191 customers still off
    • 125 customers still off
  • Supply restored
CavanFault
11 customers affected · began Sun 25 Oct, 06:55 · restored 08:54 (1 h 59 min) · 5 h 6 min earlier than ESB estimated
DerrycramphFault
1,562 customers affected · began Sun 25 Oct, 03:37 · restored 03:57 (20 min) · 10 h 3 min earlier than ESB estimated
MullaghFault
30 customers affected · began Sun 25 Oct, 01:08 · restored 07:37 (7 h 29 min) · 6 h 23 min earlier than ESB estimated
ArignaFault
304 customers affected · began Sun 25 Oct, 01:04 · restored 12:42 (12 h 38 min) · 7 h 18 min earlier than ESB estimated
  • Outage began · 304 customers
  • 57 customers still off
  • Supply restored
FineaFault
81 customers affected · began Sat 24 Oct, 18:51 · restored 20:34 (1 h 43 min) · 18 h 26 min earlier than ESB estimated
BallyconnellFault
2,691 customers affected · began Sat 24 Oct, 18:39 · restored 18:47 (8 min) · 20 h 13 min earlier than ESB estimated
CavanFault
81 customers affected · began Sat 24 Oct, 18:39 · restored Sun 25 Oct, 13:51 (20 h 12 min) · 6 h 9 min earlier than ESB estimated
Repeat fault - outage 2 of 2 at this location in quick succession
BallyconnellFault
648 customers affected · began Sat 24 Oct, 17:34 · restored 17:48 (14 min) · 2 h 12 min earlier than ESB estimated
CavanFault
81 customers affected · began Sat 24 Oct, 17:34 · off for about 1 h · no restore time published
Repeat fault - outage 1 of 2 at this location in quick succession
CavanFault
83 customers affected · began Sat 24 Oct, 17:12 · restored 17:28 (16 min) · 2 h 32 min earlier than ESB estimated
CavanFault
729 customers affected · began Sat 24 Oct, 16:28 · restored 17:33 (1 h 5 min)
CavanFault
720 customers affected · began Sat 24 Oct, 16:24 · restored 17:12 (48 min) · 3 h 48 min earlier than ESB estimated
MullaghFault
30 customers affected · began Sat 24 Oct, 16:05 · restored 17:38 (1 h 33 min) · 37 min earlier than ESB estimated
FineaFault
26 customers affected · began Sat 24 Oct, 15:51 · off for about 1 h 30 min · no restore time published
FineaFault
78 customers affected · began Sat 24 Oct, 15:50 · restored 20:04 (4 h 14 min) · 1 h 26 min earlier than ESB estimated
BallyconnellFault
1,422 customers affected · began Sat 24 Oct, 15:43 · restored 16:25 (42 min) · 4 h 35 min earlier than ESB estimated
CavanFault
868 customers affected · began Sat 24 Oct, 15:41 · restored 16:09 (28 min) · 36 min earlier than ESB estimated
Repeat fault - outage 2 of 2 at this location in quick succession
FineaFault
628 customers affected · began Sat 24 Oct, 15:16 · restored 18:57 (3 h 41 min) · 2 h 3 min earlier than ESB estimated
  • Outage began · 628 customers
  • 3 further updates
    • 582 customers still off
    • 468 customers still off
    • 237 customers still off
  • Supply restored
BallyconnellFault
3,465 customers affected · began Sat 24 Oct, 15:06 · restored 15:39 (33 min) · 36 min earlier than ESB estimated
  • Outage began · 3,465 customers
  • 2 further updates
    • 834 customers still off
    • 175 customers still off
  • Supply restored
CavanFault
868 customers affected · began Sat 24 Oct, 15:06 · restored 15:34 (28 min) · 41 min earlier than ESB estimated
Repeat fault - outage 1 of 2 at this location in quick succession
FineaFault
603 customers affected · began Sat 24 Oct, 12:46 · restored 14:15 (1 h 29 min) · 7 h 45 min earlier than ESB estimated
DerrycramphFault
17 customers affected · began Sat 24 Oct, 11:25 · restored 16:17 (4 h 52 min) · 43 min earlier than ESB estimated
FineaFault
79 customers affected · began Sat 24 Oct, 09:55 · restored 18:25 (8 h 30 min) · 3 h 35 min earlier than ESB estimated
CavanFault
30 customers affected · began Fri 23 Oct, 15:56 · restored 17:29 (1 h 33 min) · 16 min earlier than ESB estimated
FineaFault
12 customers affected · began Fri 23 Oct, 14:22 · restored 15:48 (1 h 26 min) · 1 h 12 min earlier than ESB estimated
ErrigalPlanned · new connections
21 customers affected · began Fri 23 Oct, 10:43 · listed for about 2 h 30 min · no end time published
CavanPlanned · supply quality
36 customers affected · began Fri 23 Oct, 09:51 · listed for about 5 h 30 min · no end time published
BallyjamesduffPlanned · supply quality
62 customers affected · began Fri 23 Oct, 09:48 · listed for about 4 h 30 min · no end time published
CavanPlanned · network upgrade
79 customers affected · began Fri 23 Oct, 09:45 · listed for about 4 h · no end time published
DerrycramphPlanned · network upgrade
46 customers affected · began Fri 23 Oct, 09:31 · listed for about 5 h · no end time published
DerrycramphPlanned · network upgrade
43 customers affected · began Thu 22 Oct, 10:02 · listed for about 4 h · no end time published
BailieboroPlanned
33 customers affected · began Thu 22 Oct, 09:17 · scheduled until 17:00 (7 h 43 min)
BallyjamesduffFault
33 customers affected · began Wed 21 Oct, 15:13 · restored 17:36 (2 h 23 min) · 54 min earlier than ESB estimated
CavanPlanned · supply quality
14 customers affected · began Wed 21 Oct, 11:32 · scheduled until 17:00 (5 h 28 min)
DerrycramphPlanned · new connections
61 customers affected · began Wed 21 Oct, 11:30 · listed for about 2 h 30 min · no end time published
CavanPlanned · network upgrade
83 customers affected · began Wed 21 Oct, 09:29 · scheduled until 17:30 (8 h 1 min)
BallyjamesduffFault
1,006 customers affected · began Tue 20 Oct, 19:25 · restored Wed 21 Oct, 11:40 (16 h 15 min) · 2 h 5 min earlier than ESB estimated
  • Outage began · 1,006 customers
  • 2 further updates
    • 162 customers still off
    • 22 customers still off
  • Supply restored
VirginiaPlanned · network upgrade
10 customers affected · began Tue 20 Oct, 10:45 · scheduled until 17:00 (6 h 15 min)
CavanPlanned · network upgrade
152 customers affected · began Tue 20 Oct, 09:38 · listed for about 6 h 30 min · no end time published
DerrycramphPlanned
40 customers affected · began Sat 17 Oct, 09:39 · listed for about 1 h 30 min · no end time published
FineaFault
11 customers affected · began Sat 17 Oct, 08:24 · restored 11:42 (3 h 18 min) · 1 h 48 min earlier than ESB estimated
BallyjamesduffPlanned · new connections
41 customers affected · began Fri 16 Oct, 11:12 · listed for about 3 h · no end time published
CavanPlanned · network upgrade
65 customers affected · began Fri 16 Oct, 10:10 · listed for about 6 h · no end time published
KilleshandraPlanned · network upgrade
15 customers affected · began Fri 16 Oct, 09:06 · listed for about 5 h · no end time published
MullaghPlanned · network upgrade
201 customers affected · began Thu 15 Oct, 10:17 · listed for about 6 h · no end time published
BallyjamesduffPlanned · network upgrade
23 customers affected · began Thu 15 Oct, 09:56 · listed for about 5 h · no end time published
DerrycramphPlanned · network upgrade
10 customers affected · began Thu 15 Oct, 09:42 · listed for about 4 h 30 min · no end time published
BailieboroFault
54 customers affected · began Wed 14 Oct, 13:35 · restored 14:53 (1 h 18 min) · 37 min earlier than ESB estimated
BallyjamesduffPlanned · new connections
27 customers affected · began Wed 14 Oct, 10:50 · listed for about 2 h · no end time published
VirginiaPlanned · supply quality
79 customers affected · began Wed 14 Oct, 10:32 · scheduled until 17:00 (6 h 28 min)
DerrycramphPlanned · network upgrade
62 customers affected · began Wed 14 Oct, 09:46 · listed for about 7 h 30 min · no end time published
KilleshandraFault
37 customers affected · began Tue 13 Oct, 20:13 · restored 21:17 (1 h 4 min) · 58 min earlier than ESB estimated
BallyconnellFault
14 customers affected · began Tue 13 Oct, 18:36 · restored 19:14 (38 min) · 1 h 16 min earlier than ESB estimated
MullaghPlanned · new connections
84 customers affected · began Tue 13 Oct, 13:11 · listed for about 1 h 30 min · no end time published
OldcastlePlanned · network upgrade
21 customers affected · began Tue 13 Oct, 11:15 · listed for about 4 h 30 min · no end time published
BallyconnellPlanned · network upgrade
123 customers affected · began Tue 13 Oct, 10:01 · scheduled until 17:30 (7 h 29 min)
BallyjamesduffFault
522 customers affected · began Mon 12 Oct, 17:40 · restored 19:25 (1 h 45 min)
BallyjamesduffFault
528 customers affected · began Mon 12 Oct, 17:32 · restored 18:33 (1 h 1 min) · 12 min earlier than ESB estimated
BallyjamesduffFault
1,847 customers affected · began Mon 12 Oct, 17:09 · restored 18:17 (1 h 8 min) · 43 min earlier than ESB estimated
  • Outage began · 1,847 customers
  • 598 customers still off
  • Supply restored
CavanPlanned · network upgrade
58 customers affected · began Mon 12 Oct, 15:25 · listed for about 30 min · no end time published
ErrigalFault
709 customers affected · began Fri 9 Oct, 20:04 · restored 21:34 (1 h 30 min) · 19 min later than ESB estimated
FineaPlanned · supply quality
13 customers affected · began Fri 9 Oct, 11:16 · scheduled until 14:00 (2 h 44 min)
CavanPlanned · new connections
47 customers affected · began Fri 9 Oct, 10:25 · listed for about 4 h 30 min · no end time published
DerrycramphPlanned
15 customers affected · began Fri 9 Oct, 10:14 · listed for about 6 h 30 min · no end time published
VirginiaFault
228 customers affected · began Thu 8 Oct, 19:48 · restored 22:06 (2 h 18 min) · 54 min earlier than ESB estimated
  • Outage began · 64 customers
  • 2 further updates
    • 228 customers still off
    • 147 customers still off
  • Supply restored
ErrigalPlanned · new connections
60 customers affected · began Thu 8 Oct, 10:22 · scheduled until 16:30 (6 h 8 min)
BallyconnellPlanned · network upgrade
46 customers affected · began Thu 8 Oct, 09:48 · scheduled until 17:00 (7 h 12 min)
VirginiaPlanned · supply quality
54 customers affected · began Wed 7 Oct, 10:40 · listed for about 6 h 30 min · no end time published
CavanPlanned · network upgrade
57 customers affected · began Wed 7 Oct, 09:11 · listed for about 6 h 30 min · no end time published
BallyjamesduffFault
113 customers affected · began Tue 6 Oct, 17:49 · restored 18:22 (33 min) · 53 min earlier than ESB estimated
BallyjamesduffFault
27 customers affected · began Tue 6 Oct, 15:00 · restored 17:17 (2 h 17 min) · 1 h 58 min earlier than ESB estimated
VirginiaPlanned · supply quality
78 customers affected · began Tue 6 Oct, 10:24 · scheduled until 17:00 (6 h 36 min)
BallyjamesduffPlanned · new connections
35 customers affected · began Tue 6 Oct, 10:17 · listed for about 2 h · no end time published
BallyconnellPlanned · network upgrade
99 customers affected · began Tue 6 Oct, 09:51 · listed for about 6 h 30 min · no end time published
BallyjamesduffPlanned · network upgrade
219 customers affected · began Mon 5 Oct, 10:37 · scheduled until 16:30 (5 h 53 min)
BallyconnellPlanned · network upgrade
37 customers affected · began Mon 5 Oct, 10:05 · scheduled until 17:00 (6 h 55 min)
BallyconnellPlanned · network upgrade
175 customers affected · began Mon 5 Oct, 09:31 · listed for about 4 h · no end time published
BallyjamesduffFault
146 customers affected · began Fri 2 Oct, 21:01 · restored 22:18 (1 h 17 min) · 57 min earlier than ESB estimated
BallyjamesduffFault
12 customers affected · began Fri 2 Oct, 20:01 · off for about 30 min · no restore time published
BallyjamesduffFault
10 customers affected · began Fri 2 Oct, 19:56 · off for about 30 min · no restore time published
BallyjamesduffFault
146 customers affected · began Fri 2 Oct, 18:54 · off for about 1 h 30 min · no restore time published
BallyjamesduffFault
11 customers affected · began Fri 2 Oct, 17:22 · restored 20:53 (3 h 31 min) · 16 h 7 min earlier than ESB estimated
BallyjamesduffFault
53 customers affected · began Fri 2 Oct, 16:46 · off for about 2 h 30 min · no restore time published
MullaghFault
50 customers affected · began Fri 2 Oct, 15:05 · restored 16:16 (1 h 11 min) · 2 h 29 min earlier than ESB estimated
BallyjamesduffFault
224 customers affected · began Fri 2 Oct, 14:53 · restored 18:35 (3 h 42 min) · 2 h 20 min later than ESB estimated
BallyjamesduffFault
738 customers affected · began Fri 2 Oct, 14:47 · restored 15:28 (41 min) · 32 min earlier than ESB estimated
Repeat fault - outage 2 of 2 at this location in quick succession
BallyjamesduffFault
1,135 customers affected · began Fri 2 Oct, 14:21 · restored 14:46 (25 min) · 44 min earlier than ESB estimated
Repeat fault - outage 1 of 2 at this location in quick succession
  • Outage began · 1,135 customers
  • 738 customers still off
  • Supply restored
DerrycramphPlanned
31 customers affected · began Fri 2 Oct, 12:49 · listed for about 2 h 30 min · no end time published
ErrigalPlanned · network upgrade
51 customers affected · began Fri 2 Oct, 10:06 · listed for about 2 h · no end time published
DerrycramphPlanned · network upgrade
20 customers affected · began Fri 2 Oct, 09:24 · listed for about 4 h 30 min · no end time published
ArignaFault
49 customers affected · began Fri 2 Oct, 07:49 · restored 10:27 (2 h 38 min) · 1 h 33 min earlier than ESB estimated
DerrycramphPlanned · network upgrade
45 customers affected · began Thu 1 Oct, 10:51 · listed for about 3 h 30 min · no end time published
BailieboroPlanned · network upgrade
60 customers affected · began Thu 1 Oct, 10:31 · scheduled until 16:30 (5 h 59 min)
BallyconnellFault
25 customers affected · began Wed 30 Sep, 23:28 · off for about 2 h · no restore time published
BallyconnellFault
222 customers affected · began Wed 30 Sep, 23:04 · restored 23:18 (14 min) · 57 min earlier than ESB estimated
KilleshandraPlanned · network upgrade
15 customers affected · began Wed 30 Sep, 09:49 · scheduled until 17:00 (7 h 11 min)
DerrycramphPlanned · network upgrade
61 customers affected · began Wed 30 Sep, 09:16 · listed for about 6 h 30 min · no end time published
KilleshandraPlanned · new connections
24 customers affected · began Tue 29 Sep, 10:24 · listed for about 4 h 30 min · no end time published
BailieboroPlanned · network upgrade
111 customers affected · began Tue 29 Sep, 10:05 · scheduled until 17:00 (6 h 55 min)
DerrycramphPlanned · network upgrade
133 customers affected · began Tue 29 Sep, 09:56 · listed for about 5 h 30 min · no end time published
BallyconnellFault
175 customers affected · began Mon 28 Sep, 15:02 · restored 17:20 (2 h 18 min)
DerrycramphPlanned · network upgrade
20 customers affected · began Mon 28 Sep, 11:05 · listed for about 4 h · no end time published
ErrigalPlanned · network upgrade
25 customers affected · began Mon 28 Sep, 10:12 · listed for about 5 h 30 min · no end time published
BailieboroPlanned · network upgrade
108 customers affected · began Mon 28 Sep, 09:56 · listed for about 6 h · no end time published
BallyconnellFault
175 customers affected · began Mon 28 Sep, 07:58 · restored 08:21 (23 min) · 39 min earlier than ESB estimated
ErrigalFault
272 customers affected · began Sun 27 Sep, 08:26 · restored 10:21 (1 h 55 min) · 51 min later than ESB estimated
ErrigalPlanned · supply quality
21 customers affected · began Fri 25 Sep, 10:42 · listed for about 3 h 30 min · no end time published
BallyconnellPlanned · network upgrade
67 customers affected · began Fri 25 Sep, 10:06 · listed for about 4 h · no end time published
BailieboroPlanned · network upgrade
30 customers affected · began Fri 25 Sep, 09:33 · scheduled until 17:00 (7 h 27 min)
KingscourtFault
61 customers affected · began Thu 24 Sep, 12:54 · restored 13:21 (27 min) · 39 min earlier than ESB estimated
BailieboroPlanned · new connections
74 customers affected · began Thu 24 Sep, 10:50 · listed for about 4 h · no end time published
BailieboroPlanned · network upgrade
54 customers affected · began Thu 24 Sep, 09:49 · listed for about 7 h · no end time published
CarrigallenPlanned · supply quality
27 customers affected · began Wed 23 Sep, 13:52 · listed for about 2 h · no end time published
BallyconnellFault
26 customers affected · began Wed 23 Sep, 10:26 · restored 13:46 (3 h 20 min) · 1 h 14 min earlier than ESB estimated
BailieboroPlanned · network upgrade
135 customers affected · began Wed 23 Sep, 10:16 · listed for about 6 h 30 min · no end time published
BallyjamesduffPlanned · network upgrade
33 customers affected · began Wed 23 Sep, 09:41 · listed for about 5 h 30 min · no end time published
FineaPlanned
35 customers affected · began Wed 23 Sep, 09:10 · listed for about 6 h · no end time published
ErrigalPlanned · new connections
41 customers affected · began Tue 22 Sep, 11:01 · listed for about 3 h · no end time published
BallyjamesduffPlanned · network upgrade
41 customers affected · began Mon 21 Sep, 10:35 · scheduled until 14:00 (3 h 25 min)
BailieboroFault
1,076 customers affected · began Sat 19 Sep, 00:19 · restored 00:57 (38 min) · 33 min earlier than ESB estimated
BailieboroFault
24 customers affected · began Fri 18 Sep, 23:59 · restored Sat 19 Sep, 22:28 (22 h 29 min) · 8 h 28 min later than ESB estimated
CavanPlanned · network upgrade
57 customers affected · began Fri 18 Sep, 09:59 · listed for about 3 h · no end time published
KilleshandraPlanned · network upgrade
55 customers affected · began Fri 18 Sep, 09:49 · listed for about 5 h · no end time published
KilleshandraPlanned · network upgrade
118 customers affected · began Thu 17 Sep, 15:53 · listed for under 30 min · no end time published
VirginiaPlanned · supply quality
129 customers affected · began Thu 17 Sep, 11:09 · listed for about 5 h 30 min · no end time published
CavanPlanned · supply quality
10 customers affected · began Thu 17 Sep, 10:11 · listed for about 5 h · no end time published
ErrigalPlanned · new connections
23 customers affected · began Wed 16 Sep, 10:53 · scheduled until 16:00 (5 h 7 min)
VirginiaPlanned · supply quality
42 customers affected · began Wed 16 Sep, 10:41 · scheduled until 17:00 (6 h 19 min)
KilleshandraPlanned · network upgrade
85 customers affected · began Wed 16 Sep, 09:11 · listed for about 7 h 30 min · no end time published
BailieboroPlanned · network upgrade
47 customers affected · began Tue 15 Sep, 10:35 · listed for about 5 h · no end time published
BallyjamesduffPlanned · supply quality
58 customers affected · began Tue 15 Sep, 10:10 · listed for about 6 h · no end time published
ErrigalPlanned · network upgrade
120 customers affected · began Tue 15 Sep, 09:19 · listed for about 7 h · no end time published
FineaPlanned · network upgrade
42 customers affected · began Mon 14 Sep, 10:28 · listed for about 6 h · no end time published
KilleshandraPlanned · network upgrade
37 customers affected · began Mon 14 Sep, 09:16 · listed for about 6 h 30 min · no end time published
VirginiaFault
807 customers affected · began Sun 13 Sep, 12:31 · restored 15:15 (2 h 44 min)
VirginiaPlanned
807 customers affected · began Sun 13 Sep, 12:31 · scheduled until 15:15 (2 h 44 min)
BallyjamesduffPlanned · supply quality
40 customers affected · began Fri 11 Sep, 12:27 · listed for about 30 min · no end time published
BallyconnellPlanned · supply quality
62 customers affected · began Fri 11 Sep, 10:22 · listed for about 3 h 30 min · no end time published
BallyconnellPlanned · supply quality
24 customers affected · began Fri 11 Sep, 10:21 · listed for about 3 h 30 min · no end time published
KilleshandraPlanned · network upgrade
55 customers affected · began Fri 11 Sep, 09:35 · listed for about 3 h · no end time published
ErrigalPlanned · network upgrade
30 customers affected · began Fri 11 Sep, 09:30 · listed for about 5 h · no end time published
BallyjamesduffPlanned · new connections
11 customers affected · began Thu 10 Sep, 10:58 · listed for about 1 h · no end time published
ErrigalPlanned · network upgrade
17 customers affected · began Thu 10 Sep, 09:40 · listed for about 5 h 30 min · no end time published
FineaPlanned · line diversion
34 customers affected · began Tue 8 Sep, 10:38 · listed for about 6 h 30 min · no end time published
ErrigalPlanned · network upgrade
12 customers affected · began Tue 8 Sep, 09:48 · listed for about 5 h 30 min · no end time published
ErrigalFault
61 customers affected · began Mon 7 Sep, 18:56 · restored 19:55 (59 min) · 1 h 35 min earlier than ESB estimated
BallyjamesduffPlanned · new connections
28 customers affected · began Mon 7 Sep, 10:01 · listed for about 3 h 30 min · no end time published
ErrigalFault
40 customers affected · began Mon 7 Sep, 03:13 · restored 09:26 (6 h 13 min) · 4 h 11 min later than ESB estimated
KingscourtFault
22 customers affected · began Fri 4 Sep, 18:51 · restored Sat 5 Sep, 11:57 (17 h 6 min) · 2 h 3 min earlier than ESB estimated
KilleshandraFault
21 customers affected · began Fri 4 Sep, 18:34 · restored 20:41 (2 h 7 min) · 19 min earlier than ESB estimated
ErrigalFault
19 customers affected · began Fri 4 Sep, 16:38 · restored 18:52 (2 h 14 min) · 38 min earlier than ESB estimated
BallyconnellPlanned · supply quality
49 customers affected · began Fri 4 Sep, 11:44 · listed for about 4 h · no end time published
ErrigalPlanned · network upgrade
19 customers affected · began Fri 4 Sep, 10:12 · listed for about 6 h · no end time published
KilleshandraPlanned · supply quality
111 customers affected · began Fri 4 Sep, 09:57 · listed for about 2 h 30 min · no end time published
BailieboroPlanned · new connections
73 customers affected · began Thu 3 Sep, 11:12 · listed for about 3 h 30 min · no end time published
BallyjamesduffPlanned · network upgrade
128 customers affected · began Thu 3 Sep, 10:55 · scheduled until 17:30 (6 h 35 min)
DerrycramphPlanned · supply quality
117 customers affected · began Thu 3 Sep, 10:01 · scheduled until 17:00 (6 h 59 min)
KilleshandraPlanned · network upgrade
48 customers affected · began Wed 2 Sep, 11:12 · listed for about 6 h · no end time published
VirginiaPlanned · supply quality
148 customers affected · began Wed 2 Sep, 10:20 · listed for about 6 h · no end time published
CavanPlanned · network upgrade
40 customers affected · began Tue 1 Sep, 10:13 · listed for about 3 h 30 min · no end time published
ErrigalPlanned · new connections
18 customers affected · began Tue 1 Sep, 10:10 · listed for about 5 h · no end time published
DerrycramphFault
1,553 customers affected · began Mon 31 Aug, 18:51 · restored 19:06 (15 min) · 54 min earlier than ESB estimated
ErrigalPlanned · network upgrade
41 customers affected · began Mon 31 Aug, 11:20 · listed for about 6 h 30 min · no end time published
DerrycramphPlanned · supply quality
28 customers affected · began Mon 31 Aug, 10:12 · listed for about 4 h 30 min · no end time published
KilleshandraPlanned · supply quality
47 customers affected · began Mon 31 Aug, 09:50 · listed for about 5 h 30 min · no end time published
BailieboroFault
54 customers affected · began Sun 30 Aug, 17:59 · restored 21:08 (3 h 9 min) · 1 h 8 min later than ESB estimated
DerrycramphFault
718 customers affected · began Sat 29 Aug, 20:31 · restored 20:57 (26 min) · 1 h 3 min earlier than ESB estimated
DerrycramphFault
141 customers affected · began Sat 29 Aug, 20:30 · restored Sun 30 Aug, 12:07 (15 h 37 min) · 2 h 53 min earlier than ESB estimated
  • Outage began · 141 customers
  • 50 customers still off
  • Supply restored
ErrigalFault
52 customers affected · began Sat 29 Aug, 13:08 · restored 13:57 (49 min) · 1 h 3 min earlier than ESB estimated
BallyconnellPlanned · network upgrade
51 customers affected · began Fri 28 Aug, 10:17 · scheduled until 16:30 (6 h 13 min)
FineaPlanned · supply quality
177 customers affected · began Fri 28 Aug, 10:05 · listed for about 5 h · no end time published
KilleshandraPlanned · network upgrade
41 customers affected · began Fri 28 Aug, 09:53 · listed for about 6 h · no end time published
ErrigalFault
35 customers affected · began Thu 27 Aug, 16:56 · restored 18:35 (1 h 39 min) · 25 min earlier than ESB estimated
CavanFault
21 customers affected · began Thu 27 Aug, 16:36 · restored 17:47 (1 h 11 min) · 13 min earlier than ESB estimated
VirginiaPlanned · network upgrade
134 customers affected · began Thu 27 Aug, 09:39 · listed for about 7 h 30 min · no end time published
BallyjamesduffFault
166 customers affected · began Wed 26 Aug, 20:51 · restored 22:35 (1 h 44 min) · 10 min earlier than ESB estimated
KilleshandraPlanned · network upgrade
111 customers affected · began Wed 26 Aug, 16:37 · listed for about 30 min · no end time published
  • Outage began · 111 customers
  • 19 customers still off
  • Last listed
ErrigalFault
509 customers affected · began Tue 25 Aug, 17:14 · restored 17:25 (11 min) · 1 h 5 min earlier than ESB estimated
BallyconnellPlanned · network upgrade
19 customers affected · began Tue 25 Aug, 12:22 · listed for about 1 h · no end time published
ClonesPlanned · supply quality
79 customers affected · began Tue 25 Aug, 11:08 · scheduled until 17:00 (5 h 52 min)
BallyconnellPlanned · network upgrade
43 customers affected · began Tue 25 Aug, 10:11 · scheduled until 12:00 (1 h 49 min)
KilleshandraPlanned · network upgrade
27 customers affected · began Tue 25 Aug, 10:07 · scheduled until 17:30 (7 h 23 min)
CavanPlanned · network upgrade
55 customers affected · began Mon 24 Aug, 10:26 · listed for about 1 h · no end time published
KilleshandraPlanned · network upgrade
53 customers affected · began Mon 24 Aug, 10:00 · scheduled until 17:30 (7 h 30 min)
ClonesPlanned · supply quality
27 customers affected · began Mon 24 Aug, 09:25 · scheduled until 17:00 (7 h 35 min)
BallyconnellPlanned · supply quality
36 customers affected · began Mon 24 Aug, 09:04 · scheduled until 17:00 (7 h 56 min)
ErrigalFault
35 customers affected · began Sun 23 Aug, 14:39 · restored 17:36 (2 h 57 min) · 36 min later than ESB estimated
ErrigalFault
35 customers affected · began Sat 22 Aug, 01:46 · restored 08:17 (6 h 31 min) · 4 h 17 min later than ESB estimated
FineaPlanned · new connections
80 customers affected · began Fri 21 Aug, 10:59 · listed for about 4 h 30 min · no end time published
BailieboroPlanned · network upgrade
36 customers affected · began Fri 21 Aug, 10:28 · listed for about 1 h · no end time published
DerrycramphPlanned · supply quality
71 customers affected · began Fri 21 Aug, 10:22 · scheduled until 17:00 (6 h 38 min)
KilleshandraFault
37 customers affected · began Fri 21 Aug, 09:23 · off for about 6 h 30 min · no restore time published
KilleshandraPlanned
15 customers affected · began Fri 21 Aug, 09:20 · listed for about 6 h 30 min · no end time published
CavanPlanned · network upgrade
354 customers affected · began Thu 20 Aug, 11:16 · scheduled until 17:00 (5 h 44 min)
DerrycramphPlanned · supply quality
70 customers affected · began Thu 20 Aug, 10:37 · listed for about 6 h · no end time published
KilleshandraPlanned · network upgrade
28 customers affected · began Thu 20 Aug, 10:02 · listed for about 5 h 30 min · no end time published
KilleshandraPlanned
138 customers affected · began Wed 19 Aug, 10:47 · listed for about 5 h 30 min · no end time published
CavanPlanned · supply quality
171 customers affected · began Wed 19 Aug, 10:00 · listed for about 5 h 30 min · no end time published
FineaFault
626 customers affected · began Tue 18 Aug, 17:00 · restored 17:18 (18 min) · 57 min earlier than ESB estimated
  • Outage began · 626 customers
  • 603 customers still off
  • Supply restored
KilleshandraPlanned
24 customers affected · began Tue 18 Aug, 10:37 · scheduled until 17:00 (6 h 23 min)
CavanPlanned · supply quality
147 customers affected · began Tue 18 Aug, 09:46 · scheduled until 17:00 (7 h 14 min)
KilleshandraPlanned
79 customers affected · began Mon 17 Aug, 10:39 · listed for about 5 h 30 min · no end time published
DerrycramphPlanned · supply quality
35 customers affected · began Mon 17 Aug, 10:07 · scheduled until 17:00 (6 h 53 min)
ErrigalFault
39 customers affected · began Sat 15 Aug, 23:28 · restored Sun 16 Aug, 01:26 (1 h 58 min) · 1 h 19 min earlier than ESB estimated
DerrycramphFault
23 customers affected · began Sat 15 Aug, 08:32 · off for about 3 h · no restore time published
VirginiaPlanned · network upgrade
41 customers affected · began Fri 14 Aug, 09:32 · listed for about 4 h 30 min · no end time published
KilleshandraPlanned · network upgrade
160 customers affected · began Thu 13 Aug, 12:13 · listed for about 4 h 30 min · no end time published
MullaghPlanned · new connections
70 customers affected · began Thu 13 Aug, 09:37 · listed for about 6 h · no end time published
CavanFault
48 customers affected · began Wed 12 Aug, 18:58 · restored 21:59 (3 h 1 min) · 59 min later than ESB estimated
KilleshandraPlanned · network upgrade
27 customers affected · began Wed 12 Aug, 14:27 · listed for about 3 h · no end time published
CavanFault
11 customers affected · began Wed 12 Aug, 13:18 · restored 13:58 (40 min) · 1 h 17 min earlier than ESB estimated
KilleshandraPlanned · network upgrade
61 customers affected · began Wed 12 Aug, 10:11 · listed for about 6 h · no end time published
KingscourtFault
896 customers affected · began Wed 12 Aug, 07:10 · restored 07:29 (19 min) · 46 min earlier than ESB estimated
BallyjamesduffPlanned · network upgrade
115 customers affected · began Tue 11 Aug, 10:58 · listed for about 5 h · no end time published
DerrycramphPlanned · supply quality
22 customers affected · began Tue 11 Aug, 10:11 · scheduled until 15:00 (4 h 49 min)
ShercockPlanned · network upgrade
76 customers affected · began Mon 10 Aug, 11:03 · listed for about 1 h 30 min · no end time published
BallyjamesduffPlanned · supply quality
57 customers affected · began Mon 10 Aug, 10:24 · listed for about 5 h 30 min · no end time published
KilleshandraPlanned · network upgrade
69 customers affected · began Mon 10 Aug, 10:23 · scheduled until 17:30 (7 h 7 min)
CavanFault
18 customers affected · began Mon 10 Aug, 09:31 · restored 11:37 (2 h 6 min) · 1 h 53 min earlier than ESB estimated
CavanFault
332 customers affected · began Mon 10 Aug, 08:04 · restored 08:11 (7 min) · 1 h 4 min earlier than ESB estimated
BallyjamesduffFault
1,845 customers affected · began Sun 9 Aug, 19:45 · restored 20:47 (1 h 2 min) · 13 min earlier than ESB estimated
  • Outage began · 1,845 customers
  • 720 customers still off
  • Supply restored
BailieboroFault
12 customers affected · began Sun 9 Aug, 11:59 · restored 13:59 (2 h) · 1 h 46 min earlier than ESB estimated
ErrigalFault
25 customers affected · began Sat 8 Aug, 19:41 · restored 21:58 (2 h 17 min) · 32 min earlier than ESB estimated
MullaghPlanned · network upgrade
33 customers affected · began Fri 7 Aug, 10:33 · listed for about 3 h · no end time published
KilleshandraPlanned · network upgrade
37 customers affected · began Fri 7 Aug, 10:01 · listed for about 4 h · no end time published
CavanPlanned · supply quality
40 customers affected · began Fri 7 Aug, 09:43 · listed for about 7 h · no end time published
MullaghPlanned · network upgrade
15 customers affected · began Fri 7 Aug, 09:35 · listed for about 6 h · no end time published
KilleshandraPlanned · network upgrade
108 customers affected · began Thu 6 Aug, 13:02 · listed for about 4 h · no end time published
CavanPlanned · supply quality
47 customers affected · began Thu 6 Aug, 09:39 · scheduled until 17:00 (7 h 21 min)
ErrigalFault
20 customers affected · began Wed 5 Aug, 15:27 · restored 17:08 (1 h 41 min) · 1 h 37 min earlier than ESB estimated
ErrigalPlanned · new connections
25 customers affected · began Wed 5 Aug, 11:30 · listed for about 3 h 30 min · no end time published
KilleshandraPlanned · network upgrade
112 customers affected · began Wed 5 Aug, 09:50 · listed for about 7 h · no end time published
ArignaPlanned
25 customers affected · began Tue 4 Aug, 13:59 · listed for about 2 h · no end time published
CavanPlanned · supply quality
89 customers affected · began Tue 4 Aug, 11:11 · scheduled until 17:00 (5 h 49 min)
CavanFault
56 customers affected · began Tue 4 Aug, 09:57 · expected back by 17:00 (about 7 h) · no restore time published
BallyconnellFault
16 customers affected · began Mon 3 Aug, 23:57 · restored Tue 4 Aug, 07:14 (7 h 17 min) · 59 min later than ESB estimated
FineaFault
26 customers affected · began Mon 3 Aug, 18:10 · restored 21:35 (3 h 25 min) · 1 h 25 min earlier than ESB estimated

Areas with an outage · 85 areas