Outage history · 207 outages
This list as a CSV file, one row per outage, times in UTC.
AbbeyfealeFault
14 customers affected · began Fri 25 Sep, 17:04 · still out when last checked · expected back by 19:30
Roches StreetFault
51 customers affected · began Fri 25 Sep, 10:36 · off for about 1 h · no restore time published
CappamorePlanned · network upgrade
188 customers affected · began Fri 25 Sep, 10:19 · listed for about 3 h · no end time published
Roches StreetFault
10 customers affected · began Fri 25 Sep, 09:47 · restored 11:48 (2 h 1 min)
GarryspillanePlanned · network upgrade
39 customers affected · began Fri 25 Sep, 09:40 · listed for about 3 h 30 min · no end time published
GarryspillanePlanned · network upgrade
143 customers affected · began Fri 25 Sep, 09:38 · scheduled until 18:00 (8 h 22 min) · still listed when last checked
AbbeyfealePlanned · network upgrade
104 customers affected · began Fri 25 Sep, 09:27 · listed for about 7 h · no end time published
CappamoreFault
23 customers affected · began Thu 24 Sep, 17:33 · restored 18:57 (1 h 24 min) · 18 min earlier than ESB estimated
CappamorePlanned · network upgrade
174 customers affected · began Thu 24 Sep, 11:42 · listed for about 3 h 30 min · no end time published
AbbeyfealePlanned · new connections
166 customers affected · began Thu 24 Sep, 10:52 · listed for about 4 h · no end time published
RaheenPlanned · supply quality
41 customers affected · began Thu 24 Sep, 10:48 · listed for about 5 h · no end time published
CappamorePlanned · network upgrade
125 customers affected · began Thu 24 Sep, 10:38 · listed for about 6 h 30 min · no end time published
SinglandPlanned · new connections
142 customers affected · began Thu 24 Sep, 10:31 · scheduled until 17:00 (6 h 29 min)
CharlevillePlanned · network upgrade
123 customers affected · began Thu 24 Sep, 09:35 · listed for about 6 h · no end time published
CappamorePlanned · network upgrade
19 customers affected · began Wed 23 Sep, 09:49 · listed for about 7 h · no end time published
CharlevillePlanned · network upgrade
31 customers affected · began Wed 23 Sep, 09:48 · listed for about 4 h 30 min · no end time published
CappamorePlanned · supply quality
85 customers affected · began Wed 23 Sep, 09:22 · scheduled until 16:30 (7 h 8 min)
Milford (Mwr)Planned · line diversion
280 customers affected · began Wed 23 Sep, 09:16 · listed for about 8 h · no end time published
PatrickswellFault
94 customers affected · began Tue 22 Sep, 19:11 · restored 21:08 (1 h 57 min) · 22 min earlier than ESB estimated
Dock RoadPlanned
54 customers affected · began Tue 22 Sep, 14:06 · listed for about 1 h 30 min · no end time published
AbbeyfealePlanned
72 customers affected · began Tue 22 Sep, 10:24 · listed for about 7 h · no end time published
AbbeyfealePlanned · new connections
36 customers affected · began Tue 22 Sep, 10:14 · listed for about 3 h · no end time published
RathkealeFault
102 customers affected · began Mon 21 Sep, 14:49 · restored 15:40 (51 min) · 50 min earlier than ESB estimated
CharlevillePlanned · new connections
60 customers affected · began Mon 21 Sep, 11:46 · listed for about 3 h · no end time published
AbbeyfealePlanned · network upgrade
109 customers affected · began Mon 21 Sep, 09:36 · listed for about 5 h 30 min · no end time published
RaheenPlanned · new connections
119 customers affected · began Fri 18 Sep, 10:45 · listed for about 4 h 30 min · no end time published
NewcastlewestPlanned · network upgrade
380 customers affected · began Fri 18 Sep, 09:23 · listed for about 6 h · no end time published
AbbeyfealePlanned · new connections
13 customers affected · began Thu 17 Sep, 10:24 · listed for about 7 h · no end time published
CappamorePlanned · new connections
136 customers affected · began Thu 17 Sep, 10:13 · listed for about 5 h · no end time published
FoynesPlanned · supply quality
79 customers affected · began Thu 17 Sep, 09:55 · listed for about 2 h 30 min · no end time published
RathkealePlanned · network upgrade
40 customers affected · began Thu 17 Sep, 09:37 · listed for about 7 h · no end time published
BruffPlanned
257 customers affected · began Thu 17 Sep, 09:11 · listed for about 8 h · no end time published
CloonloughFault
35 customers affected · began Wed 16 Sep, 17:10 · restored 18:10 (1 h) · 1 h 20 min earlier than ESB estimated
RathkealePlanned
111 customers affected · began Wed 16 Sep, 09:49 · listed for about 4 h 30 min · no end time published
RathkealePlanned · supply quality
348 customers affected · began Wed 16 Sep, 09:32 · listed for about 8 h · no end time published
FoynesPlanned · supply quality
100 customers affected · began Tue 15 Sep, 10:26 · listed for about 3 h 30 min · no end time published
Milford (Mwr)Planned · network upgrade
86 customers affected · began Tue 15 Sep, 09:37 · listed for about 7 h 30 min · no end time published
PatrickswellFault
49 customers affected · began Tue 15 Sep, 07:38 · restored 09:19 (1 h 41 min) · 11 min earlier than ESB estimated
PatrickswellFault
10 customers affected · began Mon 14 Sep, 16:19 · restored 17:57 (1 h 38 min) · 2 h 3 min earlier than ESB estimated
AhanePlanned
15 customers affected · began Mon 14 Sep, 11:21 · listed for about 8 h · no end time published
BruffPlanned · supply quality
151 customers affected · began Mon 14 Sep, 11:14 · listed for about 5 h · no end time published
BallinacurraFault
53 customers affected · began Mon 14 Sep, 10:28 · expected back by 12:15 (about 2 h) · no restore time published
AbbeyfealePlanned · supply quality
113 customers affected · began Mon 14 Sep, 10:10 · listed for about 6 h 30 min · no end time published
CharlevillePlanned · new connections
106 customers affected · began Mon 14 Sep, 09:41 · listed for about 6 h 30 min · no end time published
RathkealeFault
20 customers affected · began Sat 12 Sep, 17:11 · restored 20:49 (3 h 38 min)
GarryspillaneFault
21 customers affected · began Sat 12 Sep, 09:20 · off for about 1 h 30 min · no restore time published
KilshannyPlanned · new connections
35 customers affected · began Sat 12 Sep, 08:23 · listed for about 5 h · no end time published
GarryspillaneFault
15 customers affected · began Fri 11 Sep, 11:18 · restored 17:02 (5 h 44 min)
CharlevillePlanned · network upgrade
52 customers affected · began Fri 11 Sep, 09:48 · listed for about 5 h 30 min · no end time published
- Outage began · 52 customers
- 21 customers still off
- Last listed
RathkealePlanned · network upgrade
125 customers affected · began Fri 11 Sep, 09:39 · scheduled until 18:00 (8 h 21 min)
MoylishFault
398 customers affected · began Fri 11 Sep, 09:16 · restored 09:42 (26 min) · 1 h 48 min earlier than ESB estimated
CappamorePlanned · supply quality
85 customers affected · began Thu 10 Sep, 10:40 · scheduled until 16:30 (5 h 50 min)
ChurchtownPlanned · network upgrade
159 customers affected · began Thu 10 Sep, 10:11 · listed for about 7 h · no end time published
BruffPlanned · new connections
76 customers affected · began Thu 10 Sep, 09:31 · listed for about 6 h 30 min · no end time published
ChurchtownPlanned · network upgrade
56 customers affected · began Thu 10 Sep, 09:29 · scheduled until 18:00 (8 h 31 min)
SinglandFault
42 customers affected · began Thu 10 Sep, 05:39 · restored 08:55 (3 h 16 min) · 1 h 40 min later than ESB estimated
ChurchtownFault
138 customers affected · began Wed 9 Sep, 14:02 · restored 16:41 (2 h 39 min) · 1 h 19 min earlier than ESB estimated
RathkealeFault
13 customers affected · began Wed 9 Sep, 10:58 · restored 12:36 (1 h 38 min) · 39 min earlier than ESB estimated
ChurchtownPlanned · network upgrade
228 customers affected · began Wed 9 Sep, 10:45 · listed for about 7 h · no end time published
RathkealePlanned · supply quality
10 customers affected · began Wed 9 Sep, 10:31 · listed for about 2 h · no end time published
CappamorePlanned · new connections
10 customers affected · began Wed 9 Sep, 10:21 · listed for about 3 h 30 min · no end time published
CappamorePlanned · supply quality
59 customers affected · began Wed 9 Sep, 09:26 · scheduled until 16:30 (7 h 4 min)
SinglandPlanned · new connections
142 customers affected · began Tue 8 Sep, 11:17 · listed for about 5 h · no end time published
NewcastlewestPlanned · supply quality
329 customers affected · began Tue 8 Sep, 10:34 · listed for about 6 h 30 min · no end time published
ChurchtownPlanned · network upgrade
178 customers affected · began Tue 8 Sep, 10:07 · listed for about 7 h · no end time published
BruffPlanned · new connections
82 customers affected · began Tue 8 Sep, 10:00 · listed for about 4 h 30 min · no end time published
NewcastlewestPlanned
20 customers affected · began Mon 7 Sep, 14:32 · scheduled until 18:00 (3 h 28 min)
CappamorePlanned · network upgrade
129 customers affected · began Mon 7 Sep, 11:10 · listed for about 3 h · no end time published
PatrickswellPlanned · new connections
184 customers affected · began Mon 7 Sep, 10:45 · listed for about 5 h 30 min · no end time published
CappamorePlanned · network upgrade
147 customers affected · began Mon 7 Sep, 10:26 · listed for about 2 h · no end time published
NewcastlewestPlanned · supply quality
94 customers affected · began Mon 7 Sep, 10:25 · listed for about 3 h · no end time published
CharlevillePlanned · network upgrade
205 customers affected · began Mon 7 Sep, 10:03 · listed for about 5 h · no end time published
BruffPlanned · supply quality
65 customers affected · began Mon 7 Sep, 09:36 · scheduled until 14:00 (4 h 24 min)
CappamoreFault
52 customers affected · began Sun 6 Sep, 13:02 · restored 13:57 (55 min) · 1 h 33 min earlier than ESB estimated
RathkealeFault
213 customers affected · began Sat 5 Sep, 18:49 · restored 20:15 (1 h 26 min) · 15 min later than ESB estimated
NewcastlewestPlanned · supply quality
70 customers affected · began Fri 4 Sep, 10:45 · listed for about 3 h · no end time published
RathkealePlanned · new connections
30 customers affected · began Fri 4 Sep, 10:39 · listed for about 3 h · no end time published
Milford (Mwr)Planned · supply quality
54 customers affected · began Fri 4 Sep, 10:26 · listed for about 5 h · no end time published
AbbeyfealePlanned · new connections
93 customers affected · began Thu 3 Sep, 11:38 · listed for about 4 h · no end time published
CappamorePlanned · supply quality
122 customers affected · began Thu 3 Sep, 11:11 · listed for about 3 h 30 min · no end time published
CappamorePlanned · line diversion
29 customers affected · began Thu 3 Sep, 11:07 · listed for about 4 h · no end time published
CappamorePlanned · supply quality
69 customers affected · began Thu 3 Sep, 09:46 · listed for about 5 h 30 min · no end time published
NewcastlewestFault
157 customers affected · began Tue 1 Sep, 21:18 · restored 22:31 (1 h 13 min) · 59 min earlier than ESB estimated
CappamorePlanned · network upgrade
63 customers affected · began Mon 31 Aug, 10:54 · listed for about 4 h · no end time published
Milford (Mwr)Planned · new connections
54 customers affected · began Mon 31 Aug, 10:29 · listed for about 5 h 30 min · no end time published
Dock RoadPlanned
2,046 customers affected · began Mon 31 Aug, 09:36 · listed for about 30 min · no end time published
Dock RoadPlanned
26 customers affected · began Mon 31 Aug, 09:25 · listed for about 30 min · no end time published
KilmallockFault
1,125 customers affected · began Sun 30 Aug, 21:37 · restored Mon 31 Aug, 17:26 (19 h 49 min)
- Outage began · 1,125 customers
- 46 customers still off
- Supply restored
AbbeyfealeFault
109 customers affected · began Sun 30 Aug, 10:04 · restored 15:04 (5 h) · 1 h 34 min later than ESB estimated
- Outage began · 30 customers
- 109 customers still off
- Supply restored
AbbeyfealeFault
30 customers affected · began Sun 30 Aug, 07:51 · restored 15:04 (7 h 13 min)
CharlevilleFault
24 customers affected · began Sat 29 Aug, 11:44 · restored 13:30 (1 h 46 min) · 30 min earlier than ESB estimated
ChurchtownFault
138 customers affected · began Sat 29 Aug, 00:39 · restored 01:24 (45 min) · 1 h 21 min earlier than ESB estimated
BruffFault
25 customers affected · began Fri 28 Aug, 12:16 · restored 19:30 (7 h 14 min) · 4 h 30 min later than ESB estimated
RaheenFault
588 customers affected · began Fri 28 Aug, 12:13 · restored 12:34 (21 min) · 1 h 41 min earlier than ESB estimated
AbbeyfealePlanned · network upgrade
201 customers affected · began Fri 28 Aug, 11:11 · scheduled until 18:00 (6 h 49 min)
GarryspillanePlanned · network upgrade
147 customers affected · began Fri 28 Aug, 10:49 · listed for about 6 h 30 min · no end time published
NewcastlewestPlanned · supply quality
70 customers affected · began Fri 28 Aug, 09:16 · listed for about 4 h · no end time published
ChurchtownFault
138 customers affected · began Fri 28 Aug, 04:30 · restored 07:00 (2 h 30 min) · 15 min later than ESB estimated
AbbeyfealePlanned · network upgrade
289 customers affected · began Thu 27 Aug, 10:29 · listed for about 7 h · no end time published
SinglandPlanned · supply quality
121 customers affected · began Thu 27 Aug, 10:28 · listed for about 2 h · no end time published
PatrickswellPlanned · supply quality
63 customers affected · began Thu 27 Aug, 10:14 · scheduled until 16:00 (5 h 46 min)
BruffPlanned · network upgrade
151 customers affected · began Thu 27 Aug, 09:55 · listed for about 7 h 30 min · no end time published
PatrickswellFault
49 customers affected · began Thu 27 Aug, 00:01 · restored 01:18 (1 h 17 min) · 27 min earlier than ESB estimated
BirdhillFault
97 customers affected · began Wed 26 Aug, 17:14 · expected back by 19:00 (about 2 h) · no restore time published
AbbeyfealePlanned · network upgrade
181 customers affected · began Wed 26 Aug, 10:44 · scheduled until 18:00 (7 h 16 min)
NewcastlewestPlanned · supply quality
61 customers affected · began Wed 26 Aug, 10:43 · listed for about 5 h · no end time published
BirdhillPlanned
468 customers affected · began Wed 26 Aug, 09:54 · scheduled until 17:00 (7 h 6 min)
CappamorePlanned · supply quality
61 customers affected · began Wed 26 Aug, 09:45 · scheduled until 13:00 (3 h 15 min)
BirdhillFault
97 customers affected · began Wed 26 Aug, 09:24 · off for about 1 h · no restore time published
BirdhillFault
63 customers affected · began Wed 26 Aug, 09:13 · off for about 1 h 30 min · no restore time published
BirdhillPlanned
139 customers affected · began Wed 26 Aug, 09:07 · scheduled until 17:00 (7 h 53 min)
PatrickswellFault
570 customers affected · began Wed 26 Aug, 02:26 · restored 02:32 (6 min) · 3 h 28 min earlier than ESB estimated
PatrickswellFault
2,003 customers affected · began Wed 26 Aug, 02:01 · restored 02:27 (26 min) · 48 min earlier than ESB estimated
RathkealeFault
197 customers affected · began Wed 26 Aug, 02:01 · restored 02:26 (25 min) · 49 min earlier than ESB estimated
- Outage began · 197 customers
- 135 customers still off
- Supply restored
CharlevillePlanned · line diversion
89 customers affected · began Tue 25 Aug, 10:18 · listed for about 7 h · no end time published
PatrickswellPlanned · supply quality
88 customers affected · began Tue 25 Aug, 10:03 · listed for about 4 h 30 min · no end time published
RaheenPlanned · supply quality
58 customers affected · began Tue 25 Aug, 09:40 · listed for about 1 h · no end time published
MoylishFault
398 customers affected · began Tue 25 Aug, 09:17 · restored 11:25 (2 h 8 min) · 5 min earlier than ESB estimated
AbbeyfealePlanned · network upgrade
457 customers affected · began Tue 25 Aug, 09:03 · listed for about 8 h · no end time published
FoynesFault
114 customers affected · began Mon 24 Aug, 11:53 · restored 13:14 (1 h 21 min) · 46 min earlier than ESB estimated
RaheenPlanned · new connections
90 customers affected · began Mon 24 Aug, 10:12 · scheduled until 17:00 (6 h 48 min)
RathkealePlanned · supply quality
59 customers affected · began Mon 24 Aug, 10:01 · scheduled until 14:00 (3 h 59 min)
RathkealeFault
85 customers affected · began Mon 24 Aug, 09:11 · restored 13:49 (4 h 38 min) · 1 h 19 min later than ESB estimated
BirdhillPlanned
279 customers affected · began Mon 24 Aug, 09:07 · listed for about 7 h 30 min · no end time published
RathkealeFault
125 customers affected · began Mon 24 Aug, 09:07 · restored 13:49 (4 h 42 min) · 19 min later than ESB estimated
- Outage began · 125 customers
- 40 customers still off
- Supply restored
CappamoreFault
131 customers affected · began Sun 23 Aug, 07:57 · restored 09:20 (1 h 23 min) · 25 min earlier than ESB estimated
AbbeyfealeFault
27 customers affected · began Sat 22 Aug, 10:27 · restored 14:46 (4 h 19 min) · 1 h 16 min later than ESB estimated
BruffPlanned · supply quality
78 customers affected · began Fri 21 Aug, 10:38 · listed for about 5 h · no end time published
AbbeyfealePlanned · network upgrade
279 customers affected · began Fri 21 Aug, 10:31 · listed for about 6 h 30 min · no end time published
KilmallockPlanned · network upgrade
217 customers affected · began Fri 21 Aug, 10:07 · listed for about 3 h · no end time published
KilmallockFault
59 customers affected · began Fri 21 Aug, 07:34 · restored 09:02 (1 h 28 min) · 43 min earlier than ESB estimated
KilmallockFault
1,125 customers affected · began Fri 21 Aug, 05:23 · restored 06:29 (1 h 6 min) · 1 h 1 min earlier than ESB estimated
- Outage began · 1,125 customers
- 264 customers still off
- Supply restored
CharlevilleFault
11 customers affected · began Thu 20 Aug, 17:50 · restored 19:00 (1 h 10 min) · 1 h earlier than ESB estimated
CharlevilleFault
23 customers affected · began Thu 20 Aug, 13:31 · restored 19:00 (5 h 29 min)
AbbeyfealePlanned · network upgrade
99 customers affected · began Thu 20 Aug, 10:49 · scheduled until 18:00 (7 h 11 min)
CharlevillePlanned · supply quality
34 customers affected · began Thu 20 Aug, 10:41 · listed for about 5 h · no end time published
Dock RoadPlanned
26 customers affected · began Thu 20 Aug, 09:51 · listed for under 30 min · no end time published
GarryspillanePlanned
28 customers affected · began Wed 19 Aug, 11:11 · scheduled until 18:00 (6 h 49 min)
BruffPlanned
47 customers affected · began Wed 19 Aug, 11:08 · scheduled until 18:00 (6 h 52 min)
GarryspillanePlanned · supply quality
33 customers affected · began Wed 19 Aug, 10:03 · scheduled until 17:00 (6 h 57 min)
KilmallockPlanned · network upgrade
29 customers affected · began Wed 19 Aug, 09:57 · scheduled until 18:00 (8 h 3 min)
CharlevillePlanned · network upgrade
123 customers affected · began Wed 19 Aug, 08:56 · listed for about 7 h 30 min · no end time published
RaheenPlanned · supply quality
121 customers affected · began Wed 19 Aug, 08:53 · listed for about 5 h 30 min · no end time published
AhanePlanned · supply quality
227 customers affected · began Tue 18 Aug, 14:49 · listed for about 30 min · no end time published
GarryspillanePlanned · new connections
17 customers affected · began Tue 18 Aug, 10:40 · listed for about 6 h · no end time published
RaheenPlanned · supply quality
10 customers affected · began Tue 18 Aug, 10:05 · scheduled until 17:00 (6 h 55 min)
CharlevillePlanned · network upgrade
47 customers affected · began Tue 18 Aug, 10:01 · listed for about 7 h · no end time published
CappamorePlanned · network upgrade
197 customers affected · began Tue 18 Aug, 09:32 · listed for about 4 h 30 min · no end time published
RathkealePlanned · network upgrade
213 customers affected · began Tue 18 Aug, 09:05 · listed for about 8 h · no end time published
GarryspillanePlanned · new connections
143 customers affected · began Mon 17 Aug, 10:37 · listed for about 5 h · no end time published
GarryspillanePlanned · supply quality
47 customers affected · began Mon 17 Aug, 10:34 · scheduled until 14:00 (3 h 26 min)
Milford (Mwr)Planned · new connections
19 customers affected · began Mon 17 Aug, 10:24 · scheduled until 18:00 (7 h 36 min)
RathkealeFault
33 customers affected · began Mon 17 Aug, 08:33 · restored 10:41 (2 h 8 min)
CharlevilleFault
50 customers affected · began Sun 16 Aug, 19:24 · restored 21:01 (1 h 37 min) · 59 min earlier than ESB estimated
KilmallockFault
1,123 customers affected · began Sat 15 Aug, 19:42 · restored 20:31 (49 min) · 14 min earlier than ESB estimated
KilmallockFault
10 customers affected · began Fri 14 Aug, 20:19 · restored 21:27 (1 h 8 min) · 2 h 3 min earlier than ESB estimated
GarryspillanePlanned · network upgrade
30 customers affected · began Fri 14 Aug, 11:24 · listed for about 2 h 30 min · no end time published
AbbeyfealePlanned · network upgrade
108 customers affected · began Fri 14 Aug, 09:38 · listed for about 7 h 30 min · no end time published
AhaneFault
15 customers affected · began Thu 13 Aug, 20:14 · restored 22:28 (2 h 14 min) · 28 min later than ESB estimated
CappamorePlanned · new connections
83 customers affected · began Thu 13 Aug, 10:41 · listed for about 3 h · no end time published
RathkealePlanned · new connections
54 customers affected · began Thu 13 Aug, 10:05 · listed for about 4 h 30 min · no end time published
CappamorePlanned · supply quality
215 customers affected · began Thu 13 Aug, 09:54 · scheduled until 17:00 (7 h 6 min)
AbbeyfealePlanned · network upgrade
99 customers affected · began Thu 13 Aug, 09:09 · listed for about 8 h · no end time published
BruffPlanned · supply quality
48 customers affected · began Wed 12 Aug, 14:56 · listed for about 1 h · no end time published
RathkealePlanned · new connections
38 customers affected · began Wed 12 Aug, 10:00 · listed for about 5 h · no end time published
BruffPlanned · supply quality
17 customers affected · began Wed 12 Aug, 09:40 · listed for about 2 h · no end time published
AbbeyfealePlanned · network upgrade
104 customers affected · began Wed 12 Aug, 09:32 · listed for about 7 h 30 min · no end time published
Milford (Mwr)Planned · network upgrade
78 customers affected · began Tue 11 Aug, 09:30 · listed for about 7 h · no end time published
BruffFault
134 customers affected · began Tue 11 Aug, 03:25 · restored 15:21 (11 h 56 min) · 2 h 39 min earlier than ESB estimated
- Outage began · 134 customers
- 29 customers still off
- Supply restored
BruffPlanned · network upgrade
252 customers affected · began Mon 10 Aug, 11:54 · scheduled until 18:00 (6 h 6 min)
NewcastlewestPlanned · new connections
22 customers affected · began Mon 10 Aug, 10:20 · listed for about 4 h 30 min · no end time published
CorballyPlanned · new connections
191 customers affected · began Mon 10 Aug, 10:17 · listed for about 6 h 30 min · no end time published
BruffPlanned · network upgrade
251 customers affected · began Mon 10 Aug, 10:13 · scheduled until 18:00 (7 h 47 min)
ChurchtownPlanned · supply quality
163 customers affected · began Mon 10 Aug, 09:55 · scheduled until 14:00 (4 h 5 min)
CappamorePlanned · supply quality
46 customers affected · began Mon 10 Aug, 09:23 · listed for about 5 h · no end time published
NewcastlewestFault
356 customers affected · began Sat 8 Aug, 16:44 · restored 17:02 (18 min) · 43 min earlier than ESB estimated
AhaneFault
1,417 customers affected · began Sat 8 Aug, 12:11 · restored 12:35 (24 min) · 40 min earlier than ESB estimated
Repeat fault - outage 2 of 2 at this location in quick succession
- Outage began · 1,417 customers
- 370 customers still off
- Supply restored
AhaneFault
1,865 customers affected · began Sat 8 Aug, 09:10 · restored 11:56 (2 h 46 min) · 1 h 19 min earlier than ESB estimated
Repeat fault - outage 1 of 2 at this location in quick succession
NewcastlewestFault
157 customers affected · began Fri 7 Aug, 15:06 · restored 16:34 (1 h 28 min) · 56 min earlier than ESB estimated
Milford (Mwr)Fault
19 customers affected · began Fri 7 Aug, 13:49 · restored 17:08 (3 h 19 min) · 3 h 7 min earlier than ESB estimated
NewcastlewestFault
105 customers affected · began Fri 7 Aug, 12:31 · restored 13:17 (46 min) · 1 h 28 min earlier than ESB estimated
KilmallockFault
1,123 customers affected · began Fri 7 Aug, 11:53 · restored 11:59 (6 min) · 1 h 1 min earlier than ESB estimated
CappamorePlanned · new connections
168 customers affected · began Fri 7 Aug, 10:29 · listed for about 4 h · no end time published
AbbeyfealePlanned · network upgrade
40 customers affected · began Fri 7 Aug, 09:49 · listed for about 7 h · no end time published
RathkealeFault
15 customers affected · began Fri 7 Aug, 08:11 · restored 08:45 (34 min) · 2 h earlier than ESB estimated
KilmallockFault
15 customers affected · began Fri 7 Aug, 04:36 · restored 05:01 (25 min) · 3 h 14 min earlier than ESB estimated
KilmallockFault
274 customers affected · began Fri 7 Aug, 04:18 · restored 04:39 (21 min) · 3 h 21 min earlier than ESB estimated
KilmallockFault
118 customers affected · began Fri 7 Aug, 03:56 · restored 04:53 (57 min) · 1 h 7 min earlier than ESB estimated
Repeat fault - outage 2 of 2 at this location in quick succession
KilmallockFault
489 customers affected · began Fri 7 Aug, 03:01 · restored 03:56 (55 min) · 2 h 49 min earlier than ESB estimated
Repeat fault - outage 1 of 2 at this location in quick succession
PatrickswellPlanned · new connections
34 customers affected · began Thu 6 Aug, 12:25 · listed for about 1 h · no end time published
ChurchtownPlanned · new connections
44 customers affected · began Thu 6 Aug, 10:24 · listed for about 5 h · no end time published
AbbeyfealeFault
21 customers affected · began Thu 6 Aug, 10:17 · restored 13:30 (3 h 13 min) · 1 h earlier than ESB estimated
AbbeyfealePlanned
65 customers affected · began Thu 6 Aug, 09:27 · listed for about 7 h 30 min · no end time published
AbbeyfealeFault
30 customers affected · began Wed 5 Aug, 16:34 · restored 21:42 (5 h 8 min) · 1 h 12 min later than ESB estimated
BruffPlanned · new connections
22 customers affected · began Wed 5 Aug, 13:52 · listed for about 1 h · no end time published
GarryspillanePlanned · new connections
74 customers affected · began Wed 5 Aug, 11:03 · listed for about 4 h · no end time published
AbbeyfealePlanned · network upgrade
248 customers affected · began Wed 5 Aug, 09:50 · listed for about 7 h 30 min · no end time published
CappamoreFault
15 customers affected · began Wed 5 Aug, 08:43 · restored 21:15 (12 h 32 min) · 1 h 15 min later than ESB estimated
RathkealeFault
74 customers affected · began Tue 4 Aug, 20:53 · restored 22:05 (1 h 12 min) · 55 min earlier than ESB estimated
FoynesFault
36 customers affected · began Tue 4 Aug, 13:01 · restored 15:35 (2 h 34 min) · 40 min earlier than ESB estimated
AbbeyfealePlanned · network upgrade
136 customers affected · began Tue 4 Aug, 10:26 · listed for about 7 h · no end time published
NewcastlewestPlanned · network upgrade
161 customers affected · began Tue 4 Aug, 10:26 · listed for about 7 h · no end time published
SinglandPlanned · line diversion
43 customers affected · began Tue 4 Aug, 10:23 · listed for about 1 h · no end time published
FoynesFault
37 customers affected · began Tue 4 Aug, 00:36 · restored 09:33 (8 h 57 min) · 2 h 3 min later than ESB estimated
FoynesFault
64 customers affected · began Mon 3 Aug, 17:32 · restored 23:39 (6 h 7 min) · 3 h 54 min later than ESB estimated
FoynesFault
16 customers affected · began Mon 3 Aug, 17:30 · restored 23:39 (6 h 9 min) · 3 h 54 min later than ESB estimated
FoynesFault
43 customers affected · began Mon 3 Aug, 17:26 · restored 23:39 (6 h 13 min) · 3 h 54 min later than ESB estimated