Outage history · 726 outages
This list as a CSV file, one row per outage, times in UTC.
BanagherPlanned · new connections
27 customers affected · began Wed 11 Nov, 11:12 · scheduled until 16:00 (4 h 48 min) · still listed when last checked
SalthillPlanned
10 customers affected · began Wed 11 Nov, 10:29 · scheduled until 17:00 (6 h 31 min) · still listed when last checked
BanagherPlanned · supply quality
224 customers affected · began Wed 11 Nov, 10:21 · scheduled until 17:00 (6 h 39 min) · still listed when last checked
Tuam NorthPlanned · supply quality
147 customers affected · began Wed 11 Nov, 10:08 · scheduled until 14:00 (3 h 52 min) · still listed when last checked
ClaregalwayPlanned · supply quality
54 customers affected · began Wed 11 Nov, 10:01 · scheduled until 17:00 (6 h 59 min) · still listed when last checked
RecessPlanned
12 customers affected · began Wed 11 Nov, 09:51 · scheduled until 17:00 (7 h 9 min) · still listed when last checked
AthenryPlanned · supply quality
25 customers affected · began Wed 11 Nov, 09:49 · scheduled until 16:00 (6 h 11 min) · still listed when last checked
GortFault
508 customers affected · began Wed 11 Nov, 07:51 · restored 08:22 (31 min) · 38 min earlier than ESB estimated
KilcolganFault
1,240 customers affected · began Wed 11 Nov, 07:49 · restored 08:22 (33 min) · 38 min earlier than ESB estimated
KilcolganFault
103 customers affected · began Wed 11 Nov, 07:38 · restored 10:07 (2 h 29 min) · 53 min earlier than ESB estimated
- Outage began · 103 customers
- 34 customers still off
- Supply restored
BallinasloeFault
61 customers affected · began Tue 10 Nov, 13:59 · restored 17:30 (3 h 31 min) · 1 h 15 min earlier than ESB estimated
ClaregalwayFault
61 customers affected · began Tue 10 Nov, 13:37 · restored 15:15 (1 h 38 min) · 15 min later than ESB estimated
CongPlanned · supply quality
44 customers affected · began Tue 10 Nov, 11:46 · listed for about 2 h 30 min · no end time published
CarraroePlanned · new connections
103 customers affected · began Tue 10 Nov, 10:40 · listed for about 3 h 30 min · no end time published
GortPlanned · supply quality
38 customers affected · began Tue 10 Nov, 10:39 · listed for about 4 h 30 min · no end time published
AthenryPlanned · line diversion
121 customers affected · began Tue 10 Nov, 10:34 · scheduled until 16:00 (5 h 26 min)
ClaregalwayPlanned · supply quality
81 customers affected · began Tue 10 Nov, 10:28 · listed for about 6 h · no end time published
GortPlanned · supply quality
15 customers affected · began Tue 10 Nov, 10:18 · listed for about 6 h · no end time published
RecessPlanned · supply quality
12 customers affected · began Tue 10 Nov, 10:09 · listed for about 5 h 30 min · no end time published
CreaghPlanned · line diversion
46 customers affected · began Tue 10 Nov, 10:07 · listed for about 5 h 30 min · no end time published
ClaregalwayFault
75 customers affected · began Mon 9 Nov, 16:24 · restored Tue 10 Nov, 15:58 (23 h 34 min) · 28 min later than ESB estimated
- Outage began · 75 customers
- 14 customers still off
- Supply restored
SalthillFault
27 customers affected · began Mon 9 Nov, 16:20 · restored 17:38 (1 h 18 min) · 52 min earlier than ESB estimated
ParkmorePlanned
196 customers affected · began Mon 9 Nov, 12:30 · listed for about 30 min · no end time published
ParkmorePlanned · supply quality
17 customers affected · began Mon 9 Nov, 10:49 · listed for about 5 h · no end time published
GortPlanned · supply quality
37 customers affected · began Fri 6 Nov, 11:15 · listed for about 1 h · no end time published
AthenryPlanned · supply quality
20 customers affected · began Fri 6 Nov, 10:59 · listed for about 1 h 30 min · no end time published
OranmorePlanned
129 customers affected · began Fri 6 Nov, 10:09 · listed for about 5 h 30 min · no end time published
BallyhaunisPlanned · supply quality
20 customers affected · began Fri 6 Nov, 09:52 · listed for about 4 h · no end time published
ClaregalwayPlanned · supply quality
235 customers affected · began Fri 6 Nov, 09:24 · listed for about 6 h · no end time published
TullaPlanned
33 customers affected · began Fri 6 Nov, 09:12 · listed for about 8 h · no end time published
KilcolganFault
12 customers affected · began Fri 6 Nov, 01:26 · restored 09:33 (8 h 7 min) · 12 min earlier than ESB estimated
ScreebPlanned · supply quality
21 customers affected · began Thu 5 Nov, 12:17 · listed for about 1 h 30 min · no end time published
GortPlanned · supply quality
15 customers affected · began Thu 5 Nov, 11:32 · listed for about 5 h · no end time published
AthenryPlanned · supply quality
56 customers affected · began Thu 5 Nov, 11:16 · listed for about 12 h · no end time published
ClifdenPlanned · new connections
67 customers affected · began Thu 5 Nov, 10:46 · listed for about 3 h 30 min · no end time published
CloonPlanned · supply quality
54 customers affected · began Thu 5 Nov, 09:51 · listed for about 7 h 30 min · no end time published
LoughreaPlanned · new connections
91 customers affected · began Thu 5 Nov, 09:48 · listed for about 6 h · no end time published
OranmorePlanned
10 customers affected · began Thu 5 Nov, 09:48 · listed for about 6 h · no end time published
ScreebPlanned · supply quality
12 customers affected · began Thu 5 Nov, 09:38 · listed for about 2 h 30 min · no end time published
BallinasloeFault
1,821 customers affected · began Wed 4 Nov, 16:08 · restored 16:18 (10 min) · 57 min earlier than ESB estimated
ScreebPlanned · supply quality
17 customers affected · began Wed 4 Nov, 14:21 · listed for about 1 h · no end time published
AthenryPlanned · supply quality
45 customers affected · began Wed 4 Nov, 11:00 · listed for about 5 h · no end time published
GlenamaddyPlanned · supply quality
67 customers affected · began Wed 4 Nov, 09:27 · listed for about 6 h · no end time published
ClifdenFault
46 customers affected · began Wed 4 Nov, 09:26 · restored 11:08 (1 h 42 min) · 22 min earlier than ESB estimated
ClifdenPlanned · supply quality
415 customers affected · began Wed 4 Nov, 09:26 · listed for about 6 h · no end time published
ScreebPlanned · supply quality
20 customers affected · began Wed 4 Nov, 09:22 · listed for about 4 h · no end time published
ClifdenPlanned · supply quality
79 customers affected · began Wed 4 Nov, 09:16 · listed for about 3 h 30 min · no end time published
ClifdenFault
41 customers affected · began Tue 3 Nov, 17:52 · restored 19:19 (1 h 27 min) · 1 h 26 min earlier than ESB estimated
Repeat fault - outage 2 of 2 at this location in quick succession
KilcolganFault
2,906 customers affected · began Tue 3 Nov, 17:50 · restored 18:59 (1 h 9 min) · 31 min earlier than ESB estimated
OranmoreFault
852 customers affected · began Tue 3 Nov, 17:50 · restored 18:49 (59 min) · 1 h 41 min earlier than ESB estimated
AthenryFault
63 customers affected · began Tue 3 Nov, 17:34 · restored 20:14 (2 h 40 min) · 29 min later than ESB estimated
SalthillFault
12 customers affected · began Tue 3 Nov, 17:17 · restored 21:13 (3 h 56 min) · 1 h 2 min earlier than ESB estimated
ClifdenFault
41 customers affected · began Tue 3 Nov, 11:49 · restored 17:51 (6 h 2 min) · 3 h 9 min earlier than ESB estimated
Repeat fault - outage 1 of 2 at this location in quick succession
KilcolganPlanned · supply quality
75 customers affected · began Tue 3 Nov, 11:21 · listed for about 30 min · no end time published
BallinasloePlanned · supply quality
48 customers affected · began Tue 3 Nov, 10:48 · listed for about 5 h · no end time published
HeadfordPlanned · supply quality
18 customers affected · began Tue 3 Nov, 09:41 · listed for about 5 h · no end time published
KilcolganPlanned · supply quality
41 customers affected · began Tue 3 Nov, 09:26 · listed for about 1 h · no end time published
ScreebPlanned · supply quality
329 customers affected · began Tue 3 Nov, 09:01 · listed for about 6 h 30 min · no end time published
KilcolganFault
1,239 customers affected · began Tue 3 Nov, 04:11 · restored 04:57 (46 min) · 18 min earlier than ESB estimated
CastlereaFault
115 customers affected · began Mon 2 Nov, 20:51 · restored 21:53 (1 h 2 min) · 1 h 7 min earlier than ESB estimated
KilcolganFault
13 customers affected · began Mon 2 Nov, 19:22 · restored 20:50 (1 h 28 min) · 1 h 10 min earlier than ESB estimated
OranmorePlanned
514 customers affected · began Mon 2 Nov, 17:25 · listed for about 30 min · no end time published
SpiddalFault
71 customers affected · began Mon 2 Nov, 11:45 · restored 12:32 (47 min) · 2 h 13 min earlier than ESB estimated
GortPlanned · supply quality
49 customers affected · began Mon 2 Nov, 11:03 · listed for about 2 h · no end time published
KilcolganPlanned · supply quality
46 customers affected · began Mon 2 Nov, 10:55 · listed for about 2 h · no end time published
CloonPlanned · supply quality
16 customers affected · began Mon 2 Nov, 10:45 · scheduled until 15:00 (4 h 15 min)
CloonPlanned · supply quality
10 customers affected · began Mon 2 Nov, 09:54 · listed for about 6 h · no end time published
AthenryFault
41 customers affected · began Mon 2 Nov, 09:38 · restored 14:11 (4 h 33 min)
ClifdenPlanned · supply quality
105 customers affected · began Mon 2 Nov, 09:11 · listed for about 7 h · no end time published
KilcolganFault
128 customers affected · began Mon 2 Nov, 03:34 · off for about 5 h 30 min · no restore time published
AthenryFault
98 customers affected · began Sun 1 Nov, 17:54 · restored 20:19 (2 h 25 min)
- Outage began · 98 customers
- 41 customers still off
- Supply restored
AthenryFault
541 customers affected · began Sun 1 Nov, 12:52 · restored Mon 2 Nov, 14:30 (25 h 38 min)
- Outage began · 541 customers
5 further updates
- 476 customers still off
- 236 customers still off
- 78 customers still off
- 57 customers still off
- 16 customers still off
- Supply restored
CreaghFault
502 customers affected · began Sun 1 Nov, 12:52 · restored 13:11 (19 min) · 49 min earlier than ESB estimated
CastlereaFault
115 customers affected · began Sun 1 Nov, 01:36 · off for about 1 h 30 min · no restore time published
BallycrossaunPlanned · new connections
36 customers affected · began Fri 30 Oct, 10:08 · listed for about 3 h 30 min · no end time published
CarraroePlanned · supply quality
640 customers affected · began Fri 30 Oct, 09:05 · listed for about 7 h · no end time published
CarraroePlanned · supply quality
976 customers affected · began Fri 30 Oct, 09:00 · listed for about 7 h · no end time published
Galway 110kvFault
4,116 customers affected · began Fri 30 Oct, 02:55 · restored 03:49 (54 min) · 11 min earlier than ESB estimated
Tuam NorthFault
30 customers affected · began Thu 29 Oct, 18:35 · off for about 1 h · no restore time published
GlenamaddyPlanned · line diversion
58 customers affected · began Thu 29 Oct, 11:07 · listed for about 3 h · no end time published
CloonPlanned · supply quality
172 customers affected · began Thu 29 Oct, 10:52 · listed for about 5 h 30 min · no end time published
ScreebPlanned · supply quality
103 customers affected · began Thu 29 Oct, 09:22 · listed for about 8 h · no end time published
ScreebPlanned · supply quality
1,188 customers affected · began Thu 29 Oct, 09:07 · listed for about 8 h 30 min · no end time published
CurraPlanned · supply quality
199 customers affected · began Thu 29 Oct, 09:05 · listed for about 5 h · no end time published
AthenryFault
169 customers affected · began Thu 29 Oct, 07:05 · restored 08:12 (1 h 7 min) · 48 min earlier than ESB estimated
CurraFault
11 customers affected · began Wed 28 Oct, 20:34 · restored 21:13 (39 min) · 1 h 32 min earlier than ESB estimated
CreaghFault
20 customers affected · began Wed 28 Oct, 16:46 · restored 18:42 (1 h 56 min) · 1 h 18 min earlier than ESB estimated
BallyhaunisFault
52 customers affected · began Wed 28 Oct, 15:44 · restored 17:33 (1 h 49 min)
ScreebPlanned · supply quality
32 customers affected · began Wed 28 Oct, 12:54 · listed for about 30 min · no end time published
CurraPlanned · network upgrade
80 customers affected · began Wed 28 Oct, 12:48 · scheduled until 16:30 (3 h 42 min)
RecessFault
55 customers affected · began Wed 28 Oct, 11:12 · restored 19:04 (7 h 52 min)
CreaghPlanned · new connections
21 customers affected · began Wed 28 Oct, 10:56 · listed for about 5 h · no end time published
CurraPlanned · new connections
51 customers affected · began Wed 28 Oct, 10:36 · scheduled until 17:00 (6 h 24 min)
KilcolganPlanned · supply quality
200 customers affected · began Wed 28 Oct, 10:17 · listed for about 4 h 30 min · no end time published
SalthillPlanned · new connections
117 customers affected · began Wed 28 Oct, 10:15 · scheduled until 17:00 (6 h 45 min)
CarraroeFault
579 customers affected · began Tue 27 Oct, 21:42 · restored 21:59 (17 min) · 46 min earlier than ESB estimated
CurraFault
18 customers affected · began Tue 27 Oct, 13:12 · restored 16:04 (2 h 52 min) · 19 min later than ESB estimated
AthenryPlanned · network upgrade
13 customers affected · began Tue 27 Oct, 11:41 · listed for about 3 h 30 min · no end time published
SpiddalPlanned · new connections
38 customers affected · began Tue 27 Oct, 11:15 · listed for about 4 h 30 min · no end time published
AthenryPlanned · supply quality
171 customers affected · began Tue 27 Oct, 10:39 · scheduled until 16:00 (5 h 21 min)
CarraroeFault
33 customers affected · began Tue 27 Oct, 09:50 · restored 12:00 (2 h 10 min) · 2 h 45 min earlier than ESB estimated
GlenamaddyPlanned · supply quality
83 customers affected · began Tue 27 Oct, 09:49 · listed for about 5 h · no end time published
AthenryPlanned · supply quality
66 customers affected · began Tue 27 Oct, 09:40 · scheduled until 17:00 (7 h 20 min)
GortFault
104 customers affected · began Mon 26 Oct, 20:18 · restored 21:38 (1 h 20 min) · 52 min earlier than ESB estimated
HeadfordFault
46 customers affected · began Mon 26 Oct, 12:10 · restored 13:37 (1 h 27 min) · 23 min earlier than ESB estimated
CreaghFault
133 customers affected · began Mon 26 Oct, 11:52 · restored 13:46 (1 h 54 min)
Trimms LaneFault
165 customers affected · began Mon 26 Oct, 10:08 · restored 10:41 (33 min) · 2 h 19 min earlier than ESB estimated
Tuam NorthFault
57 customers affected · began Mon 26 Oct, 09:35 · restored 10:51 (1 h 16 min) · 5 h 9 min earlier than ESB estimated
RecessFault
17 customers affected · began Mon 26 Oct, 06:23 · restored 08:19 (1 h 56 min) · 5 h 41 min earlier than ESB estimated
CarraroeFault
579 customers affected · began Mon 26 Oct, 05:03 · restored 06:52 (1 h 49 min) · 3 h 8 min earlier than ESB estimated
RecessFault
464 customers affected · began Mon 26 Oct, 02:32 · restored 09:59 (7 h 27 min) · 4 h 1 min earlier than ESB estimated
RecessFault
31 customers affected · began Mon 26 Oct, 02:17 · restored 10:34 (8 h 17 min) · 3 h 26 min earlier than ESB estimated
GortFault
151 customers affected · began Sun 25 Oct, 20:00 · restored 20:18 (18 min) · 12 min earlier than ESB estimated
CurraFault
66 customers affected · began Sun 25 Oct, 16:08 · restored 16:36 (28 min) · 1 h 9 min earlier than ESB estimated
BallinasloeFault
214 customers affected · began Sun 25 Oct, 11:06 · restored 12:02 (56 min) · 43 min earlier than ESB estimated
- Outage began · 212 customers
- 214 customers still off
- Supply restored
KilcolganFault
41 customers affected · began Sun 25 Oct, 09:31 · restored 12:09 (2 h 38 min) · 1 h 51 min earlier than ESB estimated
BallinasloeFault
64 customers affected · began Sun 25 Oct, 06:59 · off for about 1 h · no restore time published
CongFault
44 customers affected · began Sun 25 Oct, 01:40 · restored 12:35 (11 h 55 min) · 7 h 25 min earlier than ESB estimated
CongFault
11 customers affected · began Sun 25 Oct, 00:09 · off for about 12 h · no restore time published
CongFault
28 customers affected · began Sat 24 Oct, 23:59 · restored Sun 25 Oct, 11:04 (12 h 5 min) · 8 h 56 min earlier than ESB estimated
KilcolganFault
92 customers affected · began Sat 24 Oct, 23:57 · restored Sun 25 Oct, 15:13 (16 h 16 min) · 47 min earlier than ESB estimated
- Outage began · 92 customers
- 51 customers still off
- Supply restored
CreaghFault
85 customers affected · began Sat 24 Oct, 23:47 · restored Sun 25 Oct, 11:39 (12 h 52 min) · 2 h 21 min earlier than ESB estimated
CarraroeFault
579 customers affected · began Sat 24 Oct, 23:46 · restored Sun 25 Oct, 00:01 (15 min) · 14 h 59 min earlier than ESB estimated
BallycrossaunFault
1,643 customers affected · began Sat 24 Oct, 22:48 · restored 23:08 (20 min) · 52 min earlier than ESB estimated
- Outage began · 1,643 customers
- 794 customers still off
- Supply restored
GortFault
15 customers affected · began Sat 24 Oct, 22:30 · restored Sun 25 Oct, 17:09 (19 h 39 min) · 9 min later than ESB estimated
WestportFault
15 customers affected · began Sat 24 Oct, 20:31 · restored Sun 25 Oct, 10:22 (14 h 51 min) · 9 h 38 min earlier than ESB estimated
LoughreaFault
969 customers affected · began Sat 24 Oct, 19:25 · restored 20:01 (36 min) · 18 h 59 min earlier than ESB estimated
AthenryFault
64 customers affected · began Sat 24 Oct, 19:18 · restored 20:56 (1 h 38 min) · 18 h 4 min earlier than ESB estimated
OranmoreFault
64 customers affected · began Sat 24 Oct, 19:17 · restored 23:24 (4 h 7 min) · 15 h 36 min earlier than ESB estimated
CurraFault
11 customers affected · began Sat 24 Oct, 19:00 · restored Sun 25 Oct, 10:49 (16 h 49 min) · 3 h 11 min earlier than ESB estimated
ClifdenFault
10 customers affected · began Sat 24 Oct, 18:10 · restored 21:06 (2 h 56 min) · 17 h 54 min earlier than ESB estimated
OughterardFault
1,125 customers affected · began Sat 24 Oct, 18:06 · restored Sun 25 Oct, 10:41 (17 h 35 min) · 9 h 19 min earlier than ESB estimated
Repeat fault - outage 2 of 2 at this location in quick succession
- Outage began · 1,125 customers
3 further updates
- 178 customers still off
- 53 customers still off
- 27 customers still off
- Supply restored
GortFault
1,208 customers affected · began Sat 24 Oct, 17:45 · restored 20:30 (2 h 45 min) · 18 h 30 min earlier than ESB estimated
- Outage began · 1,208 customers
2 further updates
- 402 customers still off
- 44 customers still off
- Supply restored
LoughreaFault
80 customers affected · began Sat 24 Oct, 17:30 · restored Sun 25 Oct, 11:48 (19 h 18 min) · 2 h 12 min earlier than ESB estimated
LoughreaFault
712 customers affected · began Sat 24 Oct, 17:27 · off for about 2 h · no restore time published
- Outage began · 712 customers
- 162 customers still off
- Last seen still out
LoughreaFault
969 customers affected · began Sat 24 Oct, 16:54 · restored 17:27 (33 min) · 2 h 33 min earlier than ESB estimated
- Outage began · 969 customers
- 712 customers still off
- Supply restored
SpiddalFault
41 customers affected · began Sat 24 Oct, 16:40 · restored Sun 25 Oct, 09:42 (18 h 2 min) · 4 h 18 min earlier than ESB estimated
AthenryFault
187 customers affected · began Sat 24 Oct, 16:24 · restored 21:16 (4 h 52 min) · 16 min later than ESB estimated
OughterardFault
1,303 customers affected · began Sat 24 Oct, 16:16 · restored 18:05 (1 h 49 min) · 2 h 55 min earlier than ESB estimated
Repeat fault - outage 1 of 2 at this location in quick succession
CurraFault
11 customers affected · began Sat 24 Oct, 15:57 · restored 18:34 (2 h 37 min) · 26 min earlier than ESB estimated
RecessFault
21 customers affected · began Sat 24 Oct, 15:39 · off for about 1 h · no restore time published
RecessFault
53 customers affected · began Sat 24 Oct, 15:28 · off for about 1 h · no restore time published
RecessFault
82 customers affected · began Sat 24 Oct, 15:11 · off for about 1 h 30 min · no restore time published
RecessFault
16 customers affected · began Sat 24 Oct, 15:09 · off for about 1 h 30 min · no restore time published
RecessFault
452 customers affected · began Sat 24 Oct, 15:08 · restored 18:34 (3 h 26 min) · 1 h 26 min earlier than ESB estimated
- Outage began · 452 customers
2 further updates
- 22 customers still off
- 12 customers still off
- Supply restored
RecessFault
91 customers affected · began Sat 24 Oct, 15:07 · restored 16:33 (1 h 26 min) · 4 h 57 min earlier than ESB estimated
BallygarFault
36 customers affected · began Sat 24 Oct, 14:58 · restored 17:09 (2 h 11 min) · 1 h 6 min earlier than ESB estimated
BallygarFault
159 customers affected · began Sat 24 Oct, 14:51 · off for about 20 h 30 min · no restore time published
- Outage began · 159 customers
3 further updates
- 75 customers still off
- 61 customers still off
- 14 customers still off
- Last seen still out
AthenryFault
208 customers affected · began Sat 24 Oct, 14:35 · expected back by 15:45 (about 1 h) · no restore time published
RecessFault
135 customers affected · began Sat 24 Oct, 11:59 · restored 13:21 (1 h 22 min) · 9 min earlier than ESB estimated
KilcolganFault
73 customers affected · began Sat 24 Oct, 10:29 · restored 17:17 (6 h 48 min) · 1 h 43 min earlier than ESB estimated
AthenryPlanned · network upgrade
96 customers affected · began Sat 24 Oct, 10:22 · listed for about 2 h · no end time published
AthenryPlanned · line diversion
47 customers affected · began Sat 24 Oct, 09:26 · listed for about 3 h · no end time published
ClifdenFault
15 customers affected · began Sat 24 Oct, 09:14 · restored 11:37 (2 h 23 min) · 53 min earlier than ESB estimated
CurraPlanned · network upgrade
13 customers affected · began Fri 23 Oct, 14:55 · listed for about 1 h · no end time published
HeadfordPlanned · supply quality
16 customers affected · began Fri 23 Oct, 09:49 · listed for about 7 h · no end time published
CurraPlanned · network upgrade
49 customers affected · began Fri 23 Oct, 09:41 · listed for about 3 h · no end time published
GortPlanned · supply quality
48 customers affected · began Fri 23 Oct, 09:30 · listed for about 4 h 30 min · no end time published
ClifdenPlanned · supply quality
42 customers affected · began Fri 23 Oct, 09:20 · listed for about 5 h · no end time published
ScreebPlanned · supply quality
15 customers affected · began Fri 23 Oct, 08:57 · listed for about 5 h · no end time published
Tuam SouthFault
50 customers affected · began Thu 22 Oct, 15:24 · restored 17:01 (1 h 37 min) · 44 min earlier than ESB estimated
SalthillPlanned · supply quality
123 customers affected · began Thu 22 Oct, 12:19 · listed for about 3 h · no end time published
GortPlanned · supply quality
20 customers affected · began Thu 22 Oct, 11:59 · listed for about 2 h 30 min · no end time published
RecessPlanned · new connections
53 customers affected · began Thu 22 Oct, 10:51 · listed for about 5 h 30 min · no end time published
GortPlanned · supply quality
13 customers affected · began Thu 22 Oct, 10:44 · listed for about 1 h 30 min · no end time published
SalthillPlanned · supply quality
66 customers affected · began Thu 22 Oct, 10:21 · listed for about 4 h · no end time published
CloonPlanned · supply quality
54 customers affected · began Thu 22 Oct, 09:47 · scheduled until 18:00 (8 h 13 min)
ClaregalwayPlanned · supply quality
92 customers affected · began Thu 22 Oct, 09:43 · listed for about 8 h · no end time published
GortPlanned · supply quality
128 customers affected · began Wed 21 Oct, 12:23 · scheduled until 16:30 (4 h 7 min)
SpiddalPlanned · new connections
40 customers affected · began Wed 21 Oct, 12:11 · scheduled until 18:00 (5 h 49 min)
ClaregalwayFault
10 customers affected · began Wed 21 Oct, 11:31 · off for about 30 min · no restore time published
AthenryPlanned
130 customers affected · began Wed 21 Oct, 11:05 · scheduled until 16:00 (4 h 55 min)
CloonPlanned · supply quality
51 customers affected · began Wed 21 Oct, 10:29 · listed for about 4 h 30 min · no end time published
CurraPlanned · network upgrade
51 customers affected · began Wed 21 Oct, 10:28 · scheduled until 17:00 (6 h 32 min)
BallycrossaunPlanned
11 customers affected · began Wed 21 Oct, 09:58 · listed for about 4 h 30 min · no end time published
GlenamaddyPlanned · supply quality
61 customers affected · began Wed 21 Oct, 09:37 · listed for about 5 h · no end time published
ClifdenPlanned · supply quality
61 customers affected · began Wed 21 Oct, 09:20 · listed for about 4 h · no end time published
LoughreaFault
74 customers affected · began Tue 20 Oct, 22:33 · restored Wed 21 Oct, 17:09 (18 h 36 min) · 1 h 51 min earlier than ESB estimated
- Outage began · 74 customers
- 36 customers still off
- Supply restored
LoughreaFault
2,159 customers affected · began Tue 20 Oct, 21:58 · restored 23:21 (1 h 23 min) · 24 min earlier than ESB estimated
- Outage began · 2,159 customers
- 1,644 customers still off
- Supply restored
ScreebFault
36 customers affected · began Tue 20 Oct, 18:09 · restored 18:48 (39 min) · 1 h 12 min earlier than ESB estimated
ScreebFault
1,369 customers affected · began Tue 20 Oct, 17:12 · restored 18:09 (57 min) · 6 min earlier than ESB estimated
- Outage began · 1,369 customers
- 1,186 customers still off
- Supply restored
ScreebFault
56 customers affected · began Tue 20 Oct, 17:01 · restored 17:42 (41 min) · 1 h 48 min earlier than ESB estimated
ScreebFault
406 customers affected · began Tue 20 Oct, 16:58 · restored 17:43 (45 min) · 1 h 47 min earlier than ESB estimated
ScreebFault
56 customers affected · began Tue 20 Oct, 16:57 · restored 17:43 (46 min) · 1 h 2 min earlier than ESB estimated
OughterardFault
13 customers affected · began Tue 20 Oct, 16:31 · restored 16:45 (14 min) · 1 h 45 min earlier than ESB estimated
OughterardPlanned · supply quality
48 customers affected · began Tue 20 Oct, 12:17 · listed for about 3 h 30 min · no end time published
BallycrossaunPlanned · new connections
23 customers affected · began Tue 20 Oct, 11:22 · listed for about 3 h · no end time published
GlenamaddyPlanned · supply quality
28 customers affected · began Tue 20 Oct, 11:04 · listed for about 4 h 30 min · no end time published
GortPlanned · supply quality
62 customers affected · began Tue 20 Oct, 11:03 · listed for about 5 h · no end time published
CreaghFault
24 customers affected · began Tue 20 Oct, 10:05 · restored 15:00 (4 h 55 min) · 1 h later than ESB estimated
ClaregalwayPlanned · line diversion
33 customers affected · began Tue 20 Oct, 10:02 · listed for about 5 h 30 min · no end time published
ScreebPlanned · supply quality
11 customers affected · began Tue 20 Oct, 09:56 · listed for about 3 h 30 min · no end time published
LoughreaPlanned · network upgrade
14 customers affected · began Tue 20 Oct, 09:23 · listed for about 2 h 30 min · no end time published
ClifdenPlanned · supply quality
183 customers affected · began Tue 20 Oct, 09:04 · listed for about 6 h · no end time published
ClifdenFault
47 customers affected · began Tue 20 Oct, 05:25 · restored 10:49 (5 h 24 min) · 34 min later than ESB estimated
ClaregalwayPlanned · new connections
68 customers affected · began Mon 19 Oct, 11:41 · listed for about 4 h · no end time published
RecessPlanned · supply quality
15 customers affected · began Mon 19 Oct, 11:09 · listed for about 4 h 30 min · no end time published
GortPlanned · supply quality
16 customers affected · began Mon 19 Oct, 10:56 · listed for about 3 h · no end time published
ClifdenPlanned · supply quality
92 customers affected · began Mon 19 Oct, 10:24 · listed for about 5 h 30 min · no end time published
CongPlanned · supply quality
171 customers affected · began Mon 19 Oct, 10:17 · scheduled until 17:00 (6 h 43 min)
CongPlanned
12 customers affected · began Mon 19 Oct, 10:16 · scheduled until 17:00 (6 h 44 min)
GlenamaddyPlanned · supply quality
37 customers affected · began Mon 19 Oct, 09:22 · listed for about 6 h 30 min · no end time published
ClifdenFault
56 customers affected · began Sun 18 Oct, 18:00 · restored 21:07 (3 h 7 min) · 37 min later than ESB estimated
BallygarFault
42 customers affected · began Sun 18 Oct, 09:49 · restored 14:04 (4 h 15 min) · 2 h 19 min later than ESB estimated
AthenryFault
78 customers affected · began Sat 17 Oct, 12:14 · restored 14:54 (2 h 40 min) · 2 h 6 min earlier than ESB estimated
AthenryFault
78 customers affected · began Sat 17 Oct, 11:42 · restored 12:15 (33 min)
GlenamaddyPlanned · supply quality
22 customers affected · began Fri 16 Oct, 12:19 · listed for about 1 h · no end time published
BallinrobePlanned · new connections
85 customers affected · began Fri 16 Oct, 11:54 · listed for about 2 h · no end time published
GlenamaddyPlanned · new connections
13 customers affected · began Fri 16 Oct, 11:22 · listed for about 2 h · no end time published
CurraPlanned
23 customers affected · began Fri 16 Oct, 10:36 · listed for about 2 h 30 min · no end time published
ScreebPlanned · new connections
56 customers affected · began Fri 16 Oct, 10:36 · listed for about 3 h 30 min · no end time published
GortPlanned · supply quality
81 customers affected · began Fri 16 Oct, 10:11 · listed for about 4 h · no end time published
BallycrossaunPlanned · supply quality
28 customers affected · began Fri 16 Oct, 09:38 · listed for about 5 h 30 min · no end time published
ScreebPlanned · supply quality
216 customers affected · began Fri 16 Oct, 09:31 · listed for about 5 h · no end time published
KilcolganFault
34 customers affected · began Thu 15 Oct, 18:03 · off for about 30 min · no restore time published
GlenamaddyPlanned
95 customers affected · began Thu 15 Oct, 14:32 · listed for about 30 min · no end time published
GlenamaddyPlanned
124 customers affected · began Thu 15 Oct, 14:31 · listed for about 30 min · no end time published
CarraroePlanned · new connections
40 customers affected · began Thu 15 Oct, 11:21 · scheduled until 16:30 (5 h 9 min)
OughterardPlanned · new connections
36 customers affected · began Thu 15 Oct, 11:07 · scheduled until 17:00 (5 h 53 min)
AthenryFault
59 customers affected · began Thu 15 Oct, 10:48 · restored 12:56 (2 h 8 min)
OughterardPlanned · supply quality
109 customers affected · began Thu 15 Oct, 10:13 · listed for about 7 h · no end time published
GortPlanned · supply quality
115 customers affected · began Thu 15 Oct, 09:50 · listed for about 6 h · no end time published
GlenamaddyPlanned · supply quality
51 customers affected · began Thu 15 Oct, 09:43 · listed for about 6 h · no end time published
OughterardPlanned · supply quality
188 customers affected · began Thu 15 Oct, 09:19 · listed for about 7 h 30 min · no end time published
BanagherPlanned · supply quality
24 customers affected · began Thu 15 Oct, 09:12 · listed for about 30 min · no end time published
ClifdenFault
10 customers affected · began Wed 14 Oct, 19:47 · expected back by Thu 15 Oct, 00:00 (about 4 h) · no restore time published
Tuam NorthFault
2,031 customers affected · began Wed 14 Oct, 18:31 · restored 19:15 (44 min) · 30 min earlier than ESB estimated
GlenamaddyFault
611 customers affected · began Wed 14 Oct, 18:31 · restored 19:37 (1 h 6 min) · 8 min earlier than ESB estimated
GlenamaddyFault
124 customers affected · began Wed 14 Oct, 18:05 · restored 20:28 (2 h 23 min) · 1 h 2 min earlier than ESB estimated
GlenamaddyFault
21 customers affected · began Wed 14 Oct, 17:59 · restored 19:24 (1 h 25 min) · 51 min earlier than ESB estimated
GlenamaddyFault
611 customers affected · began Wed 14 Oct, 17:53 · restored 17:58 (5 min) · 1 h 2 min earlier than ESB estimated
GlenamaddyFault
45 customers affected · began Wed 14 Oct, 17:41 · restored 19:32 (1 h 51 min) · 28 min earlier than ESB estimated
BallinasloeFault
43 customers affected · began Wed 14 Oct, 17:28 · restored 18:09 (41 min) · 1 h 21 min earlier than ESB estimated
CongPlanned · supply quality
895 customers affected · began Wed 14 Oct, 16:03 · scheduled until 17:00 (57 min)
ClifdenFault
28 customers affected · began Wed 14 Oct, 11:45 · restored 14:55 (3 h 10 min) · 20 min earlier than ESB estimated
Tuam NorthPlanned · supply quality
23 customers affected · began Wed 14 Oct, 11:28 · scheduled until 16:00 (4 h 32 min)
CreaghPlanned
16 customers affected · began Wed 14 Oct, 11:15 · listed for about 3 h · no end time published
GortPlanned · supply quality
151 customers affected · began Wed 14 Oct, 11:01 · listed for about 5 h · no end time published
ScreebFault
28 customers affected · began Wed 14 Oct, 10:30 · restored 14:33 (4 h 3 min) · 1 h 33 min later than ESB estimated
CongPlanned
28 customers affected · began Wed 14 Oct, 10:21 · listed for about 5 h 30 min · no end time published
GlenamaddyPlanned · supply quality
107 customers affected · began Wed 14 Oct, 10:05 · listed for about 5 h 30 min · no end time published
ScreebPlanned · supply quality
43 customers affected · began Wed 14 Oct, 09:37 · listed for about 4 h · no end time published
CarraroePlanned · supply quality
86 customers affected · began Wed 14 Oct, 09:25 · listed for about 7 h 30 min · no end time published
CreaghFault
82 customers affected · began Wed 14 Oct, 09:20 · restored 16:27 (7 h 7 min) · 33 min earlier than ESB estimated
ScreebFault
1,341 customers affected · began Tue 13 Oct, 19:32 · restored 19:43 (11 min) · 1 h 2 min earlier than ESB estimated
ScreebFault
28 customers affected · began Tue 13 Oct, 17:27 · expected back by 22:00 (about 4 h 30 min) · no restore time published
LoughreaFault
31 customers affected · began Tue 13 Oct, 12:05 · restored 14:09 (2 h 4 min) · 51 min earlier than ESB estimated
OughterardPlanned · line diversion
126 customers affected · began Tue 13 Oct, 11:20 · scheduled until 17:00 (5 h 40 min)
SalthillPlanned · line diversion
32 customers affected · began Tue 13 Oct, 11:20 · scheduled until 17:00 (5 h 40 min)
ScreebFault
26 customers affected · began Tue 13 Oct, 11:18 · restored 11:54 (36 min) · 1 h 21 min earlier than ESB estimated
ScreebFault
46 customers affected · began Tue 13 Oct, 11:17 · restored 17:20 (6 h 3 min) · 3 h 40 min earlier than ESB estimated
- Outage began · 46 customers
- 28 customers still off
- Supply restored
LoughreaPlanned · network upgrade
29 customers affected · began Tue 13 Oct, 10:38 · listed for about 4 h 30 min · no end time published
AthenryPlanned · line diversion
96 customers affected · began Tue 13 Oct, 10:37 · scheduled until 16:00 (5 h 23 min)
RecessPlanned · supply quality
68 customers affected · began Tue 13 Oct, 10:09 · listed for about 7 h · no end time published
SpiddalFault
13 customers affected · began Tue 13 Oct, 09:56 · restored 14:47 (4 h 51 min)
ClifdenPlanned · supply quality
70 customers affected · began Tue 13 Oct, 09:51 · scheduled until 18:00 (8 h 9 min)
Tuam NorthPlanned · supply quality
133 customers affected · began Tue 13 Oct, 09:34 · listed for about 6 h 30 min · no end time published
CreaghPlanned · supply quality
165 customers affected · began Tue 13 Oct, 09:24 · scheduled until 17:00 (7 h 36 min)
CarraroeFault
40 customers affected · began Tue 13 Oct, 08:26 · restored 12:45 (4 h 19 min) · 45 min earlier than ESB estimated
CarraroeFault
99 customers affected · began Tue 13 Oct, 08:18 · restored 12:43 (4 h 25 min) · 2 h 28 min later than ESB estimated
ScreebFault
1,369 customers affected · began Tue 13 Oct, 08:12 · restored 11:47 (3 h 35 min)
- Outage began · 1,369 customers
3 further updates
- 1,282 customers still off
- 1,186 customers still off
- 1,008 customers still off
- Supply restored
SpiddalFault
42 customers affected · began Mon 12 Oct, 14:15 · restored 15:43 (1 h 28 min) · 1 h 47 min earlier than ESB estimated
GortPlanned · supply quality
15 customers affected · began Mon 12 Oct, 10:31 · scheduled until 16:30 (5 h 59 min)
CarraroeFault
397 customers affected · began Mon 12 Oct, 10:30 · restored 11:30 (1 h)
BanagherPlanned · supply quality
198 customers affected · began Mon 12 Oct, 10:17 · listed for about 6 h 30 min · no end time published
GlenamaddyPlanned · supply quality
118 customers affected · began Mon 12 Oct, 10:15 · listed for about 6 h 30 min · no end time published
ScreebPlanned · supply quality
319 customers affected · began Mon 12 Oct, 09:29 · listed for about 7 h 30 min · no end time published
SalthillFault
307 customers affected · began Sun 11 Oct, 10:52 · restored 11:03 (11 min) · 57 min earlier than ESB estimated
SalthillFault
100 customers affected · began Sun 11 Oct, 10:08 · restored 11:21 (1 h 13 min) · 39 min earlier than ESB estimated
SalthillFault
485 customers affected · began Sun 11 Oct, 10:01 · restored 11:21 (1 h 20 min) · 39 min earlier than ESB estimated
- Outage began · 485 customers
- 385 customers still off
- Supply restored
SalthillFault
792 customers affected · began Sun 11 Oct, 08:48 · restored 09:56 (1 h 8 min) · 2 h 4 min earlier than ESB estimated
AthenryFault
15 customers affected · began Sat 10 Oct, 13:21 · restored 14:50 (1 h 29 min) · 25 min earlier than ESB estimated
HeadfordFault
10 customers affected · began Sat 10 Oct, 11:45 · restored 16:36 (4 h 51 min) · 2 h 21 min later than ESB estimated
BallycrossaunFault
865 customers affected · began Sat 10 Oct, 08:51 · restored 12:51 (4 h) · 2 h 9 min earlier than ESB estimated
- Outage began · 865 customers
3 further updates
- 790 customers still off
- 581 customers still off
- 191 customers still off
- Supply restored
BallycrossaunFault
11 customers affected · began Sat 10 Oct, 08:47 · restored 10:33 (1 h 46 min) · 12 min earlier than ESB estimated
BallycrossaunFault
790 customers affected · began Sat 10 Oct, 08:46 · expected back by 10:00 (about 1 h) · no restore time published
HeadfordFault
10 customers affected · began Sat 10 Oct, 01:22 · restored 09:11 (7 h 49 min) · 5 h 26 min later than ESB estimated
KilcolganFault
15 customers affected · began Fri 9 Oct, 19:33 · restored Sat 10 Oct, 12:32 (16 h 59 min) · 1 h 58 min earlier than ESB estimated
OranmoreFault
18 customers affected · began Fri 9 Oct, 15:49 · restored 18:06 (2 h 17 min) · 6 min later than ESB estimated
CarraroePlanned · network upgrade
21 customers affected · began Fri 9 Oct, 14:41 · scheduled until 16:00 (1 h 19 min)
ClifdenFault
37 customers affected · began Fri 9 Oct, 13:15 · restored 14:43 (1 h 28 min) · 32 min earlier than ESB estimated
Galway 110kvPlanned · supply quality
19 customers affected · began Fri 9 Oct, 13:11 · listed for about 2 h 30 min · no end time published
ClaregalwayFault
15 customers affected · began Fri 9 Oct, 12:49 · restored 17:56 (5 h 7 min) · 2 h 56 min later than ESB estimated
GortPlanned · supply quality
121 customers affected · began Fri 9 Oct, 11:15 · scheduled until 16:00 (4 h 45 min)
Tuam NorthPlanned · line diversion
51 customers affected · began Fri 9 Oct, 11:00 · listed for about 2 h · no end time published
OranmorePlanned · supply quality
14 customers affected · began Fri 9 Oct, 10:19 · listed for about 2 h · no end time published
ClaregalwayPlanned · supply quality
28 customers affected · began Fri 9 Oct, 09:39 · listed for about 3 h · no end time published
BallycrossaunPlanned · supply quality
25 customers affected · began Fri 9 Oct, 09:17 · listed for about 4 h · no end time published
KilcolganFault
15 customers affected · began Thu 8 Oct, 16:29 · expected back by 20:00 (about 3 h 30 min) · no restore time published
ClaregalwayPlanned · supply quality
28 customers affected · began Thu 8 Oct, 12:24 · listed for about 4 h · no end time published
GortPlanned · line diversion
37 customers affected · began Thu 8 Oct, 11:01 · scheduled until 16:00 (4 h 59 min)
GlenamaddyPlanned · supply quality
63 customers affected · began Thu 8 Oct, 10:51 · listed for about 6 h 30 min · no end time published
Galway 110kvPlanned · supply quality
56 customers affected · began Thu 8 Oct, 09:34 · scheduled until 18:00 (8 h 26 min)
ClaregalwayPlanned · supply quality
132 customers affected · began Thu 8 Oct, 09:14 · listed for about 2 h 30 min · no end time published
CarraroePlanned · network upgrade
251 customers affected · began Thu 8 Oct, 08:19 · listed for about 8 h 30 min · no end time published
CreaghPlanned
17 customers affected · began Wed 7 Oct, 11:35 · scheduled until 12:00 (25 min)
SalthillPlanned · new connections
201 customers affected · began Wed 7 Oct, 10:32 · listed for about 6 h · no end time published
OranmoreFault
81 customers affected · began Wed 7 Oct, 09:22 · off for about 2 h · no restore time published
- Outage began · 76 customers
- 81 customers still off
- Last seen still out
SpiddalFault
12 customers affected · began Wed 7 Oct, 09:19 · restored 11:07 (1 h 48 min) · 53 min earlier than ESB estimated
SalthillPlanned · line diversion
16 customers affected · began Tue 6 Oct, 14:07 · scheduled until 17:00 (2 h 53 min)
KilcolganPlanned · new connections
95 customers affected · began Tue 6 Oct, 10:38 · listed for about 4 h · no end time published
ClaregalwayFault
46 customers affected · began Tue 6 Oct, 10:20 · restored 12:30 (2 h 10 min) · 15 min later than ESB estimated
BallycrossaunPlanned · supply quality
157 customers affected · began Tue 6 Oct, 09:45 · scheduled until 17:00 (7 h 15 min)
CarraroePlanned · network upgrade
578 customers affected · began Tue 6 Oct, 08:21 · scheduled until 17:30 (9 h 9 min)
AthenryFault
84 customers affected · began Mon 5 Oct, 13:20 · restored 17:24 (4 h 4 min) · 6 min earlier than ESB estimated
BallycrossaunPlanned · supply quality
11 customers affected · began Mon 5 Oct, 09:33 · listed for about 6 h 30 min · no end time published
AthenryPlanned · network upgrade
527 customers affected · began Mon 5 Oct, 09:10 · listed for about 7 h 30 min · no end time published
HeadfordPlanned
125 customers affected · began Sun 4 Oct, 06:50 · listed for about 7 h 30 min · no end time published
HeadfordFault
11 customers affected · began Sat 3 Oct, 11:37 · restored 15:54 (4 h 17 min) · 1 h 54 min later than ESB estimated
HeadfordPlanned
16 customers affected · began Sat 3 Oct, 09:55 · scheduled until 17:00 (7 h 5 min)
ClaregalwayFault
16 customers affected · began Fri 2 Oct, 19:20 · restored 22:56 (3 h 36 min) · 11 min later than ESB estimated
WestportFault
24 customers affected · began Fri 2 Oct, 12:56 · restored 15:35 (2 h 39 min) · 1 h 25 min earlier than ESB estimated
GortPlanned · supply quality
55 customers affected · began Fri 2 Oct, 11:47 · listed for about 1 h 30 min · no end time published
GlenamaddyPlanned · line diversion
51 customers affected · began Fri 2 Oct, 11:08 · listed for about 4 h 30 min · no end time published
WestportFault
25 customers affected · began Thu 1 Oct, 15:25 · restored 17:09 (1 h 44 min) · 1 h 21 min earlier than ESB estimated
GortPlanned
67 customers affected · began Thu 1 Oct, 10:45 · listed for about 4 h 30 min · no end time published
ClaregalwayFault
124 customers affected · began Thu 1 Oct, 08:15 · restored 09:45 (1 h 30 min) · 30 min earlier than ESB estimated
WestportFault
15 customers affected · began Wed 30 Sep, 19:46 · restored 23:39 (3 h 53 min) · 1 h 51 min earlier than ESB estimated
KilcolganFault
12 customers affected · began Wed 30 Sep, 15:42 · restored 18:27 (2 h 45 min) · 33 min earlier than ESB estimated
RecessFault
58 customers affected · began Wed 30 Sep, 13:25 · restored 16:02 (2 h 37 min) · 28 min earlier than ESB estimated
LoughreaPlanned · network upgrade
34 customers affected · began Wed 30 Sep, 11:51 · scheduled until 17:00 (5 h 9 min)
AthenryPlanned · supply quality
13 customers affected · began Wed 30 Sep, 11:03 · scheduled until 16:30 (5 h 27 min)
GortPlanned · supply quality
77 customers affected · began Wed 30 Sep, 10:07 · listed for about 6 h · no end time published
CreaghPlanned · supply quality
165 customers affected · began Wed 30 Sep, 09:30 · scheduled until 17:00 (7 h 30 min)
RecessFault
395 customers affected · began Tue 29 Sep, 19:58 · off for about 1 h · no restore time published
- Outage began · 395 customers
- 58 customers still off
- Last seen still out
CurraFault
137 customers affected · began Tue 29 Sep, 17:58 · restored 21:43 (3 h 45 min) · 2 h 43 min later than ESB estimated
KilcolganFault
123 customers affected · began Tue 29 Sep, 16:55 · off for about 1 h · no restore time published
GortFault
147 customers affected · began Tue 29 Sep, 16:39 · restored Wed 30 Sep, 11:12 (18 h 33 min) · 2 h 48 min earlier than ESB estimated
KilcolganFault
38 customers affected · began Tue 29 Sep, 14:35 · restored 19:54 (5 h 19 min)
Tuam NorthFault
56 customers affected · began Tue 29 Sep, 14:22 · restored 16:36 (2 h 14 min) · 21 min later than ESB estimated
Repeat fault - outage 2 of 2 at this location in quick succession
ScreebFault
48 customers affected · began Tue 29 Sep, 11:48 · restored 17:55 (6 h 7 min) · 25 min later than ESB estimated
Tuam NorthFault
56 customers affected · began Tue 29 Sep, 10:54 · restored 14:16 (3 h 22 min) · 31 min later than ESB estimated
Repeat fault - outage 1 of 2 at this location in quick succession
AthenryPlanned · line diversion
96 customers affected · began Tue 29 Sep, 10:17 · listed for about 5 h · no end time published
LoughreaPlanned · new connections
113 customers affected · began Tue 29 Sep, 09:40 · scheduled until 17:00 (7 h 20 min)
CurraPlanned
26 customers affected · began Tue 29 Sep, 09:38 · listed for about 4 h · no end time published
ClifdenFault
18 customers affected · began Mon 28 Sep, 14:07 · restored 16:00 (1 h 53 min)
GortPlanned · supply quality
62 customers affected · began Mon 28 Sep, 10:23 · listed for about 4 h · no end time published
CurraFault
910 customers affected · began Mon 28 Sep, 07:26 · restored 09:14 (1 h 48 min) · 3 h 46 min earlier than ESB estimated
- Outage began · 910 customers
2 further updates
- 642 customers still off
- 69 customers still off
- Supply restored
CurraFault
69 customers affected · began Mon 28 Sep, 02:51 · restored 09:14 (6 h 23 min) · 3 h 46 min earlier than ESB estimated
ClifdenFault
2,185 customers affected · began Sun 27 Sep, 19:49 · restored 20:06 (17 min) · 54 min earlier than ESB estimated
- Outage began · 2,185 customers
- 393 customers still off
- Supply restored
ScreebFault
31 customers affected · began Sun 27 Sep, 14:05 · restored 19:00 (4 h 55 min)
ClaregalwayFault
32 customers affected · began Sat 26 Sep, 08:32 · restored 09:52 (1 h 20 min) · 1 h 38 min earlier than ESB estimated
ClaregalwayPlanned · line diversion
94 customers affected · began Fri 25 Sep, 13:10 · listed for about 1 h · no end time published
GortPlanned · supply quality
58 customers affected · began Fri 25 Sep, 11:47 · listed for about 1 h · no end time published
KilcolganPlanned · supply quality
437 customers affected · began Fri 25 Sep, 09:39 · listed for about 6 h · no end time published
KilcolganPlanned · line diversion
126 customers affected · began Fri 25 Sep, 09:38 · listed for about 4 h 30 min · no end time published
SpiddalPlanned · new connections
122 customers affected · began Thu 24 Sep, 10:47 · listed for about 4 h 30 min · no end time published
HeadfordPlanned · new connections
94 customers affected · began Thu 24 Sep, 10:36 · listed for about 2 h 30 min · no end time published
GlenamaddyPlanned · supply quality
50 customers affected · began Thu 24 Sep, 09:55 · listed for about 6 h 30 min · no end time published
AthenryPlanned
37 customers affected · began Wed 23 Sep, 13:24 · listed for about 2 h · no end time published
BallycrossaunFault
865 customers affected · began Wed 23 Sep, 12:28 · restored 15:59 (3 h 31 min)
- Outage began · 865 customers
2 further updates
- 785 customers still off
- 19 customers still off
- Supply restored
CurraPlanned · new connections
24 customers affected · began Wed 23 Sep, 10:46 · listed for about 5 h 30 min · no end time published
AthenryPlanned · supply quality
15 customers affected · began Wed 23 Sep, 10:42 · listed for about 4 h 30 min · no end time published
GortPlanned · supply quality
83 customers affected · began Wed 23 Sep, 10:29 · scheduled until 17:00 (6 h 31 min)
GortPlanned · supply quality
77 customers affected · began Wed 23 Sep, 10:18 · listed for about 5 h · no end time published
GlenamaddyPlanned · supply quality
20 customers affected · began Wed 23 Sep, 10:16 · listed for about 6 h 30 min · no end time published
CurraPlanned · supply quality
23 customers affected · began Wed 23 Sep, 10:14 · scheduled until 17:00 (6 h 46 min)
AthenryPlanned · supply quality
62 customers affected · began Wed 23 Sep, 10:00 · scheduled until 14:00 (4 h)
SpiddalPlanned · supply quality
310 customers affected · began Tue 22 Sep, 12:22 · listed for under 30 min · no end time published
AthenryPlanned · new connections
67 customers affected · began Tue 22 Sep, 11:08 · listed for about 4 h · no end time published
SpiddalPlanned · network upgrade
15 customers affected · began Tue 22 Sep, 10:07 · listed for about 6 h 30 min · no end time published
GortPlanned · supply quality
70 customers affected · began Tue 22 Sep, 09:46 · listed for about 7 h · no end time published
AthenryPlanned · supply quality
102 customers affected · began Tue 22 Sep, 09:45 · listed for about 6 h 30 min · no end time published
CreaghFault
12 customers affected · began Mon 21 Sep, 17:26 · off for about 30 min · no restore time published
CreaghFault
157 customers affected · began Mon 21 Sep, 16:08 · restored 20:07 (3 h 59 min) · 53 min earlier than ESB estimated
- Outage began · 72 customers
- 157 customers still off
- Supply restored
LoughreaFault
29 customers affected · began Mon 21 Sep, 13:33 · restored 17:06 (3 h 33 min) · 36 min later than ESB estimated
Tuam NorthPlanned · line diversion
49 customers affected · began Mon 21 Sep, 11:30 · scheduled until 16:00 (4 h 30 min)
LoughreaPlanned · new connections
53 customers affected · began Mon 21 Sep, 10:44 · listed for about 5 h · no end time published
ClaregalwayFault
185 customers affected · began Mon 21 Sep, 09:51 · off for about 6 h · no restore time published
- Outage began · 124 customers
- 185 customers still off
- Last seen still out
GortPlanned · supply quality
111 customers affected · began Mon 21 Sep, 09:48 · scheduled until 17:00 (7 h 12 min)
Trimms LaneFault
24 customers affected · began Sun 20 Sep, 19:09 · restored 22:31 (3 h 22 min) · 1 h 16 min later than ESB estimated
BallycrossaunFault
164 customers affected · began Sun 20 Sep, 10:33 · restored 11:40 (1 h 7 min) · 20 min earlier than ESB estimated
BallycrossaunFault
28 customers affected · began Sat 19 Sep, 21:59 · off for about 1 h 30 min · no restore time published
BallycrossaunFault
486 customers affected · began Sat 19 Sep, 21:54 · restored 22:59 (1 h 5 min)
BallycrossaunFault
84 customers affected · began Sat 19 Sep, 21:53 · restored 22:59 (1 h 6 min) · 46 min earlier than ESB estimated
BallycrossaunFault
130 customers affected · began Sat 19 Sep, 21:44 · restored 23:51 (2 h 7 min) · 6 min later than ESB estimated
GlenamaddyFault
69 customers affected · began Sat 19 Sep, 18:46 · off for about 2 h · no restore time published
CongFault
11 customers affected · began Fri 18 Sep, 22:55 · expected back by Sat 19 Sep, 00:45 (about 2 h) · no restore time published
CongFault
28 customers affected · began Fri 18 Sep, 22:53 · restored Sat 19 Sep, 11:28 (12 h 35 min) · 2 h 32 min earlier than ESB estimated
SalthillFault
13 customers affected · began Fri 18 Sep, 18:53 · expected back by 22:00 (about 3 h) · no restore time published
Tuam NorthFault
36 customers affected · began Fri 18 Sep, 18:32 · restored 19:23 (51 min) · 37 min earlier than ESB estimated
CreaghFault
11 customers affected · began Fri 18 Sep, 15:12 · restored 18:29 (3 h 17 min) · 31 min earlier than ESB estimated
AthenryPlanned · new connections
18 customers affected · began Fri 18 Sep, 11:15 · listed for about 2 h · no end time published
GortPlanned · supply quality
56 customers affected · began Fri 18 Sep, 10:58 · listed for about 4 h 30 min · no end time published
ScreebPlanned · supply quality
49 customers affected · began Fri 18 Sep, 10:22 · listed for about 6 h 30 min · no end time published
GortPlanned · supply quality
55 customers affected · began Fri 18 Sep, 10:19 · scheduled until 17:00 (6 h 41 min)
ClaregalwayPlanned · supply quality
124 customers affected · began Fri 18 Sep, 10:17 · listed for about 6 h · no end time published
OughterardPlanned · supply quality
13 customers affected · began Fri 18 Sep, 09:50 · scheduled until 17:00 (7 h 10 min)
KilcolganPlanned · supply quality
25 customers affected · began Fri 18 Sep, 09:38 · listed for about 2 h 30 min · no end time published
BallyhaunisPlanned · supply quality
21 customers affected · began Fri 18 Sep, 09:31 · listed for about 4 h 30 min · no end time published
ScreebPlanned · supply quality
47 customers affected · began Fri 18 Sep, 09:15 · listed for about 4 h 30 min · no end time published
HeadfordPlanned · line diversion
16 customers affected · began Thu 17 Sep, 11:22 · listed for about 1 h 30 min · no end time published
CarraroePlanned · new connections
92 customers affected · began Thu 17 Sep, 10:53 · scheduled until 17:00 (6 h 7 min)
AthenryPlanned · supply quality
114 customers affected · began Thu 17 Sep, 10:40 · listed for about 4 h 30 min · no end time published
ClaregalwayPlanned
173 customers affected · began Thu 17 Sep, 10:03 · scheduled until 18:00 (7 h 57 min)
CurraPlanned · supply quality
15 customers affected · began Thu 17 Sep, 09:43 · listed for about 2 h 30 min · no end time published
ScreebPlanned · supply quality
30 customers affected · began Thu 17 Sep, 09:14 · listed for about 7 h · no end time published
ScreebPlanned · supply quality
43 customers affected · began Thu 17 Sep, 09:08 · scheduled until 18:00 (8 h 52 min)
CastlereaFault
115 customers affected · began Wed 16 Sep, 20:25 · restored 22:49 (2 h 24 min) · 1 h 56 min earlier than ESB estimated
ClaregalwayPlanned · supply quality
35 customers affected · began Wed 16 Sep, 12:06 · listed for about 4 h · no end time published
GortPlanned · supply quality
17 customers affected · began Wed 16 Sep, 11:09 · listed for about 4 h · no end time published
OughterardPlanned · new connections
15 customers affected · began Wed 16 Sep, 10:27 · scheduled until 16:00 (5 h 33 min)
ClaregalwayPlanned · supply quality
32 customers affected · began Wed 16 Sep, 10:16 · scheduled until 13:00 (2 h 44 min)
CreaghPlanned · supply quality
48 customers affected · began Wed 16 Sep, 10:15 · scheduled until 17:00 (6 h 45 min)
OranmorePlanned · supply quality
12 customers affected · began Wed 16 Sep, 09:34 · scheduled until 17:00 (7 h 26 min)
RecessPlanned
29 customers affected · began Wed 16 Sep, 09:22 · listed for about 7 h 30 min · no end time published
ClifdenPlanned · supply quality
169 customers affected · began Wed 16 Sep, 09:18 · listed for about 6 h · no end time published
CurraPlanned · supply quality
61 customers affected · began Tue 15 Sep, 12:58 · listed for under 30 min · no end time published
KilcolganPlanned · line diversion
126 customers affected · began Tue 15 Sep, 10:36 · listed for about 6 h · no end time published
CurraPlanned · supply quality
21 customers affected · began Tue 15 Sep, 10:08 · listed for about 2 h 30 min · no end time published
CurraPlanned · supply quality
149 customers affected · began Tue 15 Sep, 10:04 · listed for about 6 h · no end time published
- Outage began · 149 customers
- 89 customers still off
- Last listed
ClifdenPlanned · supply quality
48 customers affected · began Tue 15 Sep, 09:43 · listed for about 6 h 30 min · no end time published
SalthillFault
34 customers affected · began Mon 14 Sep, 16:46 · off for about 2 h · no restore time published
WestportPlanned · network upgrade
32 customers affected · began Mon 14 Sep, 14:58 · listed for about 30 min · no end time published
GlenamaddyPlanned · supply quality
38 customers affected · began Mon 14 Sep, 10:14 · listed for about 2 h · no end time published
CurraFault
492 customers affected · began Mon 14 Sep, 10:02 · off for about 6 h 30 min · no restore time published
GlenamaddyPlanned · supply quality
69 customers affected · began Mon 14 Sep, 09:42 · listed for about 7 h · no end time published
ClifdenPlanned · supply quality
238 customers affected · began Mon 14 Sep, 09:24 · listed for about 7 h 30 min · no end time published
Tuam NorthFault
16 customers affected · began Sun 13 Sep, 19:31 · restored 21:02 (1 h 31 min) · 13 min earlier than ESB estimated
AthenryFault
1,352 customers affected · began Sun 13 Sep, 15:19 · restored 18:06 (2 h 47 min)
- Outage began · 1,352 customers
- 86 customers still off
- Supply restored
Tuam NorthFault
16 customers affected · began Sun 13 Sep, 09:25 · restored 11:00 (1 h 35 min)
CurraFault
19 customers affected · began Sun 13 Sep, 07:41 · restored 09:39 (1 h 58 min) · 1 h 51 min earlier than ESB estimated
CreaghPlanned · new connections
25 customers affected · began Fri 11 Sep, 10:32 · listed for about 4 h · no end time published
ClaregalwayPlanned · supply quality
87 customers affected · began Fri 11 Sep, 10:21 · listed for about 4 h 30 min · no end time published
LoughreaPlanned · network upgrade
82 customers affected · began Fri 11 Sep, 09:44 · listed for about 4 h 30 min · no end time published
CreaghPlanned · supply quality
165 customers affected · began Fri 11 Sep, 09:17 · listed for about 7 h · no end time published
ScreebPlanned · supply quality
90 customers affected · began Fri 11 Sep, 09:14 · listed for about 4 h · no end time published
Tuam NorthFault
162 customers affected · began Thu 10 Sep, 18:15 · restored 20:00 (1 h 45 min)
AthenryPlanned · supply quality
31 customers affected · began Thu 10 Sep, 14:43 · listed for about 2 h · no end time published
RecessPlanned · supply quality
18 customers affected · began Thu 10 Sep, 11:47 · scheduled until 16:00 (4 h 13 min)
GlenamaddyPlanned · new connections
49 customers affected · began Thu 10 Sep, 11:26 · listed for about 4 h · no end time published
SalthillPlanned
85 customers affected · began Thu 10 Sep, 10:54 · listed for about 5 h 30 min · no end time published
LoughreaPlanned · network upgrade
34 customers affected · began Thu 10 Sep, 10:15 · listed for about 5 h · no end time published
AthenryPlanned · supply quality
19 customers affected · began Thu 10 Sep, 10:03 · listed for about 2 h 30 min · no end time published
ClaregalwayPlanned
93 customers affected · began Thu 10 Sep, 09:50 · listed for about 7 h · no end time published
Tuam NorthPlanned · supply quality
146 customers affected · began Thu 10 Sep, 09:49 · scheduled until 18:00 (8 h 11 min)
AthenryPlanned · supply quality
22 customers affected · began Thu 10 Sep, 09:38 · scheduled until 16:00 (6 h 22 min)
ClifdenPlanned · supply quality
25 customers affected · began Thu 10 Sep, 09:27 · listed for about 5 h 30 min · no end time published
ScreebPlanned · supply quality
23 customers affected · began Thu 10 Sep, 08:59 · listed for about 6 h · no end time published
CreaghFault
41 customers affected · began Thu 10 Sep, 08:18 · restored 10:38 (2 h 20 min) · 8 min later than ESB estimated
HeadfordFault
1,195 customers affected · began Thu 10 Sep, 07:11 · off for about 1 h · no restore time published
Tuam NorthPlanned · supply quality
25 customers affected · began Wed 9 Sep, 16:41 · scheduled until 17:00 (19 min)
Tuam NorthPlanned
49 customers affected · began Wed 9 Sep, 16:15 · listed for about 5 h 30 min · no end time published
KilcolganFault
29 customers affected · began Wed 9 Sep, 12:27 · restored 15:00 (2 h 33 min) · 45 min earlier than ESB estimated
AthenryPlanned · supply quality
37 customers affected · began Wed 9 Sep, 11:44 · listed for about 1 h 30 min · no end time published
GlenamaddyPlanned · new connections
39 customers affected · began Wed 9 Sep, 11:04 · scheduled until 16:00 (4 h 56 min)
ClaregalwayPlanned · line diversion
173 customers affected · began Wed 9 Sep, 11:02 · listed for about 5 h · no end time published
RecessPlanned · network upgrade
87 customers affected · began Wed 9 Sep, 10:42 · listed for about 5 h 30 min · no end time published
LoughreaPlanned · network upgrade
120 customers affected · began Wed 9 Sep, 10:34 · listed for about 6 h · no end time published
LoughreaPlanned · network upgrade
13 customers affected · began Wed 9 Sep, 10:14 · scheduled until 17:00 (6 h 46 min)
AthenryPlanned · supply quality
13 customers affected · began Wed 9 Sep, 10:05 · scheduled until 16:00 (5 h 55 min)
RecessPlanned · supply quality
29 customers affected · began Wed 9 Sep, 09:42 · listed for about 6 h · no end time published
DaltonPlanned · supply quality
39 customers affected · began Wed 9 Sep, 09:28 · listed for about 8 h · no end time published
LoughreaPlanned · network upgrade
47 customers affected · began Wed 9 Sep, 09:24 · listed for about 3 h · no end time published
CloonFault
59 customers affected · began Tue 8 Sep, 18:08 · restored 20:25 (2 h 17 min) · 35 min earlier than ESB estimated
AthenryFault
96 customers affected · began Tue 8 Sep, 17:30 · restored 18:46 (1 h 16 min) · 44 min earlier than ESB estimated
AthenryPlanned
33 customers affected · began Tue 8 Sep, 17:12 · listed for about 30 min · no end time published
AthenryFault
11 customers affected · began Tue 8 Sep, 17:12 · restored 18:46 (1 h 34 min) · 44 min earlier than ESB estimated
AthenryPlanned · supply quality
65 customers affected · began Tue 8 Sep, 11:22 · scheduled until 17:30 (6 h 8 min)
Tuam NorthPlanned · supply quality
17 customers affected · began Tue 8 Sep, 11:08 · scheduled until 16:00 (4 h 52 min)
ClaregalwayPlanned · network upgrade
62 customers affected · began Tue 8 Sep, 10:36 · listed for about 4 h 30 min · no end time published
AthenryPlanned
335 customers affected · began Tue 8 Sep, 10:02 · listed for about 6 h 30 min · no end time published
ParkmorePlanned · supply quality
71 customers affected · began Tue 8 Sep, 09:52 · listed for about 7 h · no end time published
CreaghPlanned · network upgrade
16 customers affected · began Tue 8 Sep, 09:39 · scheduled until 17:00 (7 h 21 min)
ClifdenPlanned · supply quality
30 customers affected · began Tue 8 Sep, 09:37 · listed for about 5 h · no end time published
ClifdenPlanned · supply quality
241 customers affected · began Tue 8 Sep, 09:05 · listed for about 5 h 30 min · no end time published
AthenryPlanned · supply quality
14 customers affected · began Mon 7 Sep, 11:43 · listed for about 30 min · no end time published
CloonPlanned · supply quality
132 customers affected · began Mon 7 Sep, 10:46 · scheduled until 18:00 (7 h 14 min)
ClaregalwayPlanned · supply quality
218 customers affected · began Mon 7 Sep, 10:08 · listed for about 8 h 30 min · no end time published
AthenryPlanned
15 customers affected · began Mon 7 Sep, 10:01 · listed for about 5 h · no end time published
RecessPlanned · supply quality
11 customers affected · began Mon 7 Sep, 09:43 · listed for about 6 h · no end time published
CreaghPlanned
165 customers affected · began Mon 7 Sep, 09:19 · listed for about 7 h · no end time published
RecessPlanned · supply quality
30 customers affected · began Mon 7 Sep, 09:13 · listed for about 5 h 30 min · no end time published
AthenryPlanned · network upgrade
423 customers affected · began Mon 7 Sep, 09:12 · scheduled until 17:00 (7 h 48 min)
AthenryFault
51 customers affected · began Sun 6 Sep, 19:14 · restored 21:11 (1 h 57 min) · 34 min earlier than ESB estimated
Tuam NorthFault
29 customers affected · began Sun 6 Sep, 16:07 · restored 17:29 (1 h 22 min) · 1 h 1 min earlier than ESB estimated
ClaregalwayFault
2,448 customers affected · began Sat 5 Sep, 13:54 · restored 14:10 (16 min) · 2 h 20 min earlier than ESB estimated
ClaregalwayFault
32 customers affected · began Sat 5 Sep, 13:29 · off for under 30 min · no restore time published
ClaregalwayFault
64 customers affected · began Sat 5 Sep, 13:28 · off for under 30 min · no restore time published
OranmoreFault
22 customers affected · began Sat 5 Sep, 13:27 · off for under 30 min · no restore time published
ClaregalwayFault
31 customers affected · began Sat 5 Sep, 13:24 · off for under 30 min · no restore time published
ClaregalwayFault
85 customers affected · began Sat 5 Sep, 13:23 · off for about 30 min · no restore time published
OranmorePlanned
19 customers affected · began Sat 5 Sep, 09:18 · listed for about 4 h · no end time published
RoscommonFault
376 customers affected · began Fri 4 Sep, 17:33 · restored 19:18 (1 h 45 min) · 33 min later than ESB estimated
Tuam NorthPlanned · new connections
19 customers affected · began Fri 4 Sep, 12:15 · listed for about 2 h · no end time published
AthenryPlanned · supply quality
16 customers affected · began Fri 4 Sep, 12:14 · listed for about 1 h · no end time published
ClaregalwayPlanned · supply quality
81 customers affected · began Fri 4 Sep, 11:15 · listed for about 4 h · no end time published
LoughreaFault
49 customers affected · began Fri 4 Sep, 10:55 · restored 11:29 (34 min) · 1 h 31 min earlier than ESB estimated
AthenryPlanned · supply quality
20 customers affected · began Fri 4 Sep, 10:52 · listed for about 30 min · no end time published
KilcolganPlanned · network upgrade
199 customers affected · began Fri 4 Sep, 10:22 · scheduled until 17:00 (6 h 38 min)
AthenryPlanned · supply quality
15 customers affected · began Fri 4 Sep, 09:56 · listed for about 2 h · no end time published
ClifdenPlanned · supply quality
38 customers affected · began Fri 4 Sep, 09:31 · listed for about 6 h · no end time published
ScreebPlanned · supply quality
65 customers affected · began Fri 4 Sep, 09:28 · listed for about 5 h 30 min · no end time published
OughterardPlanned · supply quality
27 customers affected · began Fri 4 Sep, 09:27 · listed for about 5 h 30 min · no end time published
GortFault
506 customers affected · began Thu 3 Sep, 22:08 · expected back by 23:15 (about 1 h) · no restore time published
AthenryPlanned · line diversion
58 customers affected · began Thu 3 Sep, 10:58 · scheduled until 16:00 (5 h 2 min)
KilcolganPlanned
39 customers affected · began Thu 3 Sep, 10:55 · listed for about 5 h 30 min · no end time published
LoughreaPlanned · network upgrade
79 customers affected · began Thu 3 Sep, 10:41 · listed for about 1 h · no end time published
KilcolganPlanned
28 customers affected · began Thu 3 Sep, 10:28 · scheduled until 17:00 (6 h 32 min)
GortPlanned · network upgrade
58 customers affected · began Thu 3 Sep, 10:01 · listed for about 4 h 30 min · no end time published
AthenryPlanned · supply quality
90 customers affected · began Thu 3 Sep, 09:40 · listed for about 5 h · no end time published
ScreebPlanned · supply quality
147 customers affected · began Thu 3 Sep, 09:13 · listed for about 7 h 30 min · no end time published
CurraFault
28 customers affected · began Wed 2 Sep, 19:22 · restored 21:17 (1 h 55 min) · 13 min earlier than ESB estimated
LoughreaFault
48 customers affected · began Wed 2 Sep, 15:44 · restored 19:47 (4 h 3 min) · 13 min earlier than ESB estimated
SpiddalPlanned · supply quality
24 customers affected · began Wed 2 Sep, 13:48 · listed for about 2 h · no end time published
AthenryPlanned · supply quality
24 customers affected · began Wed 2 Sep, 13:14 · scheduled until 14:00 (46 min)
AthenryPlanned · supply quality
66 customers affected · began Wed 2 Sep, 12:00 · scheduled until 12:30 (30 min)
GortPlanned · network upgrade
139 customers affected · began Wed 2 Sep, 10:42 · scheduled until 17:00 (6 h 18 min)
KilcolganPlanned · network upgrade
54 customers affected · began Wed 2 Sep, 10:42 · scheduled until 17:00 (6 h 18 min)
AthenryPlanned · supply quality
27 customers affected · began Wed 2 Sep, 10:32 · listed for about 1 h 30 min · no end time published
AthenryPlanned · supply quality
130 customers affected · began Wed 2 Sep, 10:19 · scheduled until 18:00 (7 h 41 min)
SpiddalPlanned · supply quality
64 customers affected · began Wed 2 Sep, 09:54 · scheduled until 14:00 (4 h 6 min)
ClifdenPlanned · supply quality
23 customers affected · began Wed 2 Sep, 09:50 · listed for about 6 h 30 min · no end time published
DaltonFault
51 customers affected · began Wed 2 Sep, 09:44 · restored 11:18 (1 h 34 min) · 18 min later than ESB estimated
KilcolganPlanned · network upgrade
114 customers affected · began Wed 2 Sep, 09:20 · scheduled until 17:00 (7 h 40 min)
ScreebPlanned · supply quality
147 customers affected · began Wed 2 Sep, 08:45 · listed for about 7 h 30 min · no end time published
SalthillFault
34 customers affected · began Tue 1 Sep, 18:06 · restored 18:50 (44 min) · 1 h 25 min earlier than ESB estimated
AthenryPlanned · line diversion
18 customers affected · began Tue 1 Sep, 13:51 · scheduled until 16:00 (2 h 9 min)
SpiddalPlanned · supply quality
23 customers affected · began Tue 1 Sep, 12:16 · listed for about 4 h · no end time published
AthenryPlanned
16 customers affected · began Tue 1 Sep, 11:15 · listed for about 3 h 30 min · no end time published
SalthillPlanned
33 customers affected · began Tue 1 Sep, 10:23 · scheduled until 17:00 (6 h 37 min)
AthenryPlanned · supply quality
59 customers affected · began Tue 1 Sep, 10:20 · listed for about 5 h · no end time published
ClifdenPlanned · supply quality
42 customers affected · began Tue 1 Sep, 09:49 · scheduled until 15:00 (5 h 11 min)
BallycrossaunPlanned · new connections
17 customers affected · began Tue 1 Sep, 09:45 · listed for about 5 h 30 min · no end time published
ScreebPlanned · supply quality
86 customers affected · began Tue 1 Sep, 09:40 · listed for about 5 h 30 min · no end time published
KilcolganPlanned · network upgrade
12 customers affected · began Tue 1 Sep, 09:28 · scheduled until 17:00 (7 h 32 min)
Tuam NorthPlanned · supply quality
69 customers affected · began Tue 1 Sep, 09:28 · listed for about 7 h · no end time published
RecessPlanned · supply quality
14 customers affected · began Tue 1 Sep, 09:10 · listed for about 7 h · no end time published
HeadfordFault
1,195 customers affected · began Mon 31 Aug, 14:00 · restored 17:48 (3 h 48 min)
Repeat fault - outage 2 of 2 at this location in quick succession
- Outage began · 1,195 customers
- 10 customers still off
- Supply restored
HeadfordFault
1,195 customers affected · began Mon 31 Aug, 13:39 · restored 13:58 (19 min) · 47 min earlier than ESB estimated
Repeat fault - outage 1 of 2 at this location in quick succession
AthenryPlanned · supply quality
90 customers affected · began Mon 31 Aug, 11:25 · listed for about 2 h 30 min · no end time published
CongPlanned · supply quality
215 customers affected · began Mon 31 Aug, 11:23 · listed for about 2 h 30 min · no end time published
Tuam NorthPlanned · new connections
50 customers affected · began Mon 31 Aug, 10:54 · listed for about 4 h 30 min · no end time published
LoughreaPlanned · new connections
47 customers affected · began Mon 31 Aug, 10:40 · listed for about 6 h · no end time published
AthenryPlanned · supply quality
15 customers affected · began Mon 31 Aug, 10:04 · listed for about 1 h 30 min · no end time published
Tuam NorthPlanned · supply quality
95 customers affected · began Mon 31 Aug, 10:01 · listed for about 5 h 30 min · no end time published
ScreebPlanned · supply quality
141 customers affected · began Mon 31 Aug, 09:24 · listed for about 5 h 30 min · no end time published
RecessPlanned · supply quality
18 customers affected · began Mon 31 Aug, 09:07 · listed for about 6 h 30 min · no end time published
GlenamaddyFault
10 customers affected · began Sun 30 Aug, 10:03 · restored 12:06 (2 h 3 min) · 54 min earlier than ESB estimated
CreaghPlanned · new connections
20 customers affected · began Sat 29 Aug, 09:27 · listed for about 4 h 30 min · no end time published
OranmorePlanned · line diversion
16 customers affected · began Sat 29 Aug, 08:30 · listed for about 5 h · no end time published
Trimms LanePlanned
3,919 customers affected · began Fri 28 Aug, 15:06 · listed for about 1 h 30 min · no end time published
AthenryPlanned · supply quality
11 customers affected · began Fri 28 Aug, 13:21 · scheduled until 16:00 (2 h 39 min)
AthenryPlanned · new connections
36 customers affected · began Fri 28 Aug, 11:46 · listed for about 3 h 30 min · no end time published
AthenryFault
1,020 customers affected · began Fri 28 Aug, 10:44 · restored 11:00 (16 min) · 45 min earlier than ESB estimated
RoscommonPlanned · network upgrade
26 customers affected · began Fri 28 Aug, 10:32 · listed for about 6 h · no end time published
Tuam NorthPlanned · supply quality
98 customers affected · began Fri 28 Aug, 10:24 · listed for about 6 h · no end time published
RecessPlanned · supply quality
240 customers affected · began Fri 28 Aug, 09:20 · listed for about 4 h · no end time published
Galway 110kvFault
369 customers affected · began Fri 28 Aug, 08:26 · restored 08:47 (21 min) · 43 min earlier than ESB estimated
AthenryFault
66 customers affected · began Fri 28 Aug, 06:42 · restored 08:57 (2 h 15 min)
ScreebPlanned
20 customers affected · began Thu 27 Aug, 16:54 · listed for about 2 h · no end time published
AthenryPlanned · supply quality
63 customers affected · began Thu 27 Aug, 12:27 · listed for about 1 h 30 min · no end time published
Tuam NorthPlanned · supply quality
40 customers affected · began Thu 27 Aug, 10:26 · listed for about 6 h 30 min · no end time published
SpiddalFault
18 customers affected · began Thu 27 Aug, 09:49 · restored 13:13 (3 h 24 min) · 1 h 47 min earlier than ESB estimated
RecessPlanned · supply quality
16 customers affected · began Thu 27 Aug, 09:25 · listed for about 6 h 30 min · no end time published
ScreebPlanned · supply quality
42 customers affected · began Thu 27 Aug, 09:16 · listed for about 6 h · no end time published
ClifdenPlanned · supply quality
179 customers affected · began Thu 27 Aug, 08:54 · listed for about 8 h · no end time published
CloonFault
10 customers affected · began Wed 26 Aug, 17:05 · restored 19:54 (2 h 49 min) · 6 min earlier than ESB estimated
MoneenageishaFault
42 customers affected · began Wed 26 Aug, 15:08 · restored 19:04 (3 h 56 min) · 56 min earlier than ESB estimated
AthenryPlanned · supply quality
67 customers affected · began Wed 26 Aug, 11:40 · listed for about 3 h · no end time published
SpiddalPlanned · supply quality
49 customers affected · began Wed 26 Aug, 11:30 · scheduled until 17:00 (5 h 30 min)
ClifdenPlanned · supply quality
97 customers affected · began Wed 26 Aug, 10:52 · listed for about 5 h 30 min · no end time published
Tuam NorthPlanned · supply quality
30 customers affected · began Wed 26 Aug, 10:44 · listed for about 2 h · no end time published
Tuam NorthPlanned · supply quality
44 customers affected · began Wed 26 Aug, 10:02 · listed for about 6 h 30 min · no end time published
OughterardPlanned · supply quality
31 customers affected · began Wed 26 Aug, 09:53 · listed for about 6 h 30 min · no end time published
AthenryPlanned · supply quality
55 customers affected · began Wed 26 Aug, 09:49 · listed for about 6 h · no end time published
Tuam NorthPlanned · supply quality
59 customers affected · began Wed 26 Aug, 09:42 · listed for about 7 h 30 min · no end time published
RecessPlanned · supply quality
18 customers affected · began Wed 26 Aug, 09:21 · listed for about 5 h 30 min · no end time published
Galway 110kvFault
83 customers affected · began Tue 25 Aug, 17:51 · restored 22:13 (4 h 22 min)
- Outage began · 30 customers
- 83 customers still off
- Supply restored
CreaghPlanned · new connections
68 customers affected · began Tue 25 Aug, 11:59 · listed for about 1 h · no end time published
BallyhaunisPlanned · supply quality
104 customers affected · began Tue 25 Aug, 11:13 · listed for about 3 h 30 min · no end time published
LoughreaPlanned · network upgrade
47 customers affected · began Tue 25 Aug, 11:12 · listed for about 4 h · no end time published
Tuam NorthPlanned · supply quality
54 customers affected · began Tue 25 Aug, 10:07 · scheduled until 18:00 (7 h 53 min)
CurraPlanned · network upgrade
51 customers affected · began Tue 25 Aug, 09:59 · listed for about 6 h · no end time published
AthenryPlanned · supply quality
70 customers affected · began Tue 25 Aug, 09:54 · listed for about 5 h · no end time published
RecessPlanned
22 customers affected · began Tue 25 Aug, 09:38 · listed for about 7 h · no end time published
RecessPlanned · supply quality
17 customers affected · began Tue 25 Aug, 09:27 · listed for about 5 h 30 min · no end time published
AthenryFault
66 customers affected · began Mon 24 Aug, 11:52 · restored 13:27 (1 h 35 min) · 18 min earlier than ESB estimated
AthenryPlanned · supply quality
25 customers affected · began Mon 24 Aug, 11:10 · listed for about 3 h 30 min · no end time published
Tuam NorthPlanned · supply quality
47 customers affected · began Mon 24 Aug, 10:02 · listed for about 7 h 30 min · no end time published
CurraPlanned · network upgrade
187 customers affected · began Mon 24 Aug, 09:45 · listed for about 7 h · no end time published
ClifdenPlanned · supply quality
46 customers affected · began Mon 24 Aug, 09:41 · listed for about 8 h · no end time published
ClifdenPlanned · supply quality
62 customers affected · began Mon 24 Aug, 09:03 · listed for about 6 h 30 min · no end time published
ScreebFault
1,366 customers affected · began Sun 23 Aug, 22:02 · restored 23:31 (1 h 29 min) · 44 min earlier than ESB estimated
Repeat fault - outage 2 of 2 at this location in quick succession
ScreebFault
1,366 customers affected · began Sun 23 Aug, 21:48 · restored 21:59 (11 min) · 1 h 1 min earlier than ESB estimated
Repeat fault - outage 1 of 2 at this location in quick succession
KilcolganFault
29 customers affected · began Sun 23 Aug, 08:53 · restored 13:00 (4 h 7 min) · 1 h 45 min later than ESB estimated
CreaghFault
276 customers affected · began Sat 22 Aug, 16:20 · restored 18:09 (1 h 49 min) · 21 min earlier than ESB estimated
BallycrossaunFault
130 customers affected · began Sat 22 Aug, 13:35 · restored 17:59 (4 h 24 min) · 31 min earlier than ESB estimated
GortPlanned · new connections
29 customers affected · began Sat 22 Aug, 10:11 · listed for about 2 h · no end time published
GlenamaddyFault
10 customers affected · began Sat 22 Aug, 08:56 · off for under 30 min · no restore time published
AthenryFault
28 customers affected · began Sat 22 Aug, 08:54 · restored 14:25 (5 h 31 min)
GortFault
18 customers affected · began Fri 21 Aug, 17:56 · restored 19:28 (1 h 32 min) · 32 min earlier than ESB estimated
SalthillFault
23 customers affected · began Fri 21 Aug, 16:12 · restored 17:37 (1 h 25 min) · 1 h 23 min earlier than ESB estimated
HeadfordPlanned · supply quality
40 customers affected · began Fri 21 Aug, 14:27 · scheduled until 17:00 (2 h 33 min)
CreaghPlanned
61 customers affected · began Fri 21 Aug, 14:22 · listed for under 30 min · no end time published
SalthillPlanned · new connections
155 customers affected · began Fri 21 Aug, 11:35 · scheduled until 17:00 (5 h 25 min)
Tuam NorthPlanned · supply quality
55 customers affected · began Fri 21 Aug, 09:48 · listed for about 5 h 30 min · no end time published
Tuam NorthPlanned · supply quality
44 customers affected · began Fri 21 Aug, 09:35 · scheduled until 13:00 (3 h 25 min)
ClifdenPlanned
33 customers affected · began Fri 21 Aug, 09:03 · listed for about 5 h 30 min · no end time published
RecessPlanned
30 customers affected · began Fri 21 Aug, 09:03 · listed for about 5 h 30 min · no end time published
AthenryPlanned · supply quality
11 customers affected · began Thu 20 Aug, 15:06 · scheduled until 16:00 (54 min)
AthenryPlanned · supply quality
10 customers affected · began Thu 20 Aug, 15:00 · listed for about 30 min · no end time published
SpiddalPlanned · supply quality
16 customers affected · began Thu 20 Aug, 13:00 · listed for about 3 h 30 min · no end time published
AthenryPlanned · supply quality
20 customers affected · began Thu 20 Aug, 11:41 · listed for about 1 h · no end time published
Tuam NorthPlanned · supply quality
134 customers affected · began Thu 20 Aug, 10:33 · listed for about 5 h 30 min · no end time published
CreaghPlanned · new connections
20 customers affected · began Thu 20 Aug, 10:25 · listed for about 2 h · no end time published
ScreebPlanned · supply quality
80 customers affected · began Thu 20 Aug, 09:13 · listed for about 8 h · no end time published
CarraroeFault
65 customers affected · began Thu 20 Aug, 08:14 · restored 19:42 (11 h 28 min) · 1 h 18 min earlier than ESB estimated
RoscommonPlanned · network upgrade
26 customers affected · began Wed 19 Aug, 15:12 · listed for about 1 h · no end time published
OughterardPlanned · new connections
90 customers affected · began Wed 19 Aug, 11:55 · listed for about 4 h 30 min · no end time published
CloonPlanned · supply quality
153 customers affected · began Wed 19 Aug, 10:57 · scheduled until 18:00 (7 h 3 min)
Tuam NorthPlanned · new connections
52 customers affected · began Wed 19 Aug, 10:31 · listed for about 5 h · no end time published
Tuam NorthPlanned · supply quality
78 customers affected · began Wed 19 Aug, 10:09 · listed for about 5 h 30 min · no end time published
RecessPlanned · supply quality
18 customers affected · began Wed 19 Aug, 10:03 · scheduled until 18:00 (7 h 57 min)
SalthillPlanned · supply quality
61 customers affected · began Wed 19 Aug, 09:55 · listed for about 5 h 30 min · no end time published
AthenryPlanned · supply quality
66 customers affected · began Wed 19 Aug, 09:29 · scheduled until 16:00 (6 h 31 min)
LoughreaPlanned · network upgrade
23 customers affected · began Wed 19 Aug, 09:07 · listed for about 7 h 30 min · no end time published
GlenamaddyPlanned · supply quality
135 customers affected · began Tue 18 Aug, 16:57 · scheduled until Wed 19 Aug, 17:00 (24 h 3 min)
ClifdenFault
10 customers affected · began Tue 18 Aug, 14:26 · restored 15:35 (1 h 9 min) · 55 min earlier than ESB estimated
HeadfordPlanned · new connections
69 customers affected · began Tue 18 Aug, 11:44 · listed for about 1 h 30 min · no end time published
KilcolganPlanned · new connections
17 customers affected · began Tue 18 Aug, 11:07 · listed for about 4 h 30 min · no end time published
AthenryPlanned
57 customers affected · began Tue 18 Aug, 10:26 · scheduled until 18:00 (7 h 34 min)
AthenryPlanned · supply quality
74 customers affected · began Tue 18 Aug, 10:03 · listed for about 5 h 30 min · no end time published
CurraPlanned · network upgrade
42 customers affected · began Tue 18 Aug, 09:41 · listed for about 5 h 30 min · no end time published
OughterardPlanned · supply quality
30 customers affected · began Tue 18 Aug, 09:41 · listed for about 5 h 30 min · no end time published
ScreebPlanned · supply quality
40 customers affected · began Tue 18 Aug, 09:09 · listed for about 6 h · no end time published
HeadfordPlanned · new connections
16 customers affected · began Mon 17 Aug, 12:26 · scheduled until 16:00 (3 h 34 min)
HeadfordPlanned · supply quality
198 customers affected · began Mon 17 Aug, 11:53 · scheduled until 18:00 (6 h 7 min)
OughterardPlanned · new connections
72 customers affected · began Mon 17 Aug, 11:06 · scheduled until 17:00 (5 h 54 min)
RecessPlanned · supply quality
87 customers affected · began Mon 17 Aug, 09:23 · listed for about 7 h 30 min · no end time published
BanagherFault
68 customers affected · began Sun 16 Aug, 12:56 · restored 14:30 (1 h 34 min) · 45 min earlier than ESB estimated
GortFault
658 customers affected · began Sat 15 Aug, 20:05 · restored 20:21 (16 min) · 54 min earlier than ESB estimated
- Outage began · 658 customers
- 263 customers still off
- Supply restored
RecessFault
55 customers affected · began Sat 15 Aug, 09:20 · restored 10:41 (1 h 21 min) · 19 min earlier than ESB estimated
ScreebPlanned · supply quality
26 customers affected · began Sat 15 Aug, 09:17 · listed for about 4 h · no end time published
GlenamaddyFault
1,695 customers affected · began Fri 14 Aug, 17:17 · restored 17:46 (29 min) · 44 min earlier than ESB estimated
- Outage began · 1,695 customers
- 340 customers still off
- Supply restored
LoughreaFault
75 customers affected · began Fri 14 Aug, 15:57 · restored 22:08 (6 h 11 min) · 1 h 8 min later than ESB estimated
AthenryPlanned · supply quality
15 customers affected · began Fri 14 Aug, 11:07 · scheduled until 12:30 (1 h 23 min)
GortPlanned · network upgrade
143 customers affected · began Fri 14 Aug, 10:15 · listed for about 6 h · no end time published
AthenryPlanned · supply quality
28 customers affected · began Fri 14 Aug, 10:01 · scheduled until 16:00 (5 h 59 min)
ClaregalwayPlanned · supply quality
124 customers affected · began Fri 14 Aug, 09:34 · listed for about 7 h · no end time published
ClifdenPlanned · supply quality
163 customers affected · began Fri 14 Aug, 08:55 · listed for about 7 h · no end time published
Galway 110kvFault
703 customers affected · began Thu 13 Aug, 18:32 · restored 19:25 (53 min) · 20 min earlier than ESB estimated
Galway 110kvFault
57 customers affected · began Thu 13 Aug, 12:02 · restored 13:11 (1 h 9 min) · 49 min earlier than ESB estimated
ClaregalwayPlanned · supply quality
81 customers affected · began Thu 13 Aug, 11:03 · scheduled until 15:00 (3 h 57 min)
ClaregalwayPlanned · supply quality
159 customers affected · began Thu 13 Aug, 10:26 · listed for about 5 h 30 min · no end time published
CurraPlanned · network upgrade
22 customers affected · began Thu 13 Aug, 10:25 · listed for about 5 h · no end time published
CurraPlanned · network upgrade
180 customers affected · began Thu 13 Aug, 10:03 · scheduled until 17:00 (6 h 57 min)
RecessPlanned
37 customers affected · began Thu 13 Aug, 09:56 · scheduled until 18:00 (8 h 4 min)
SpiddalPlanned · supply quality
57 customers affected · began Thu 13 Aug, 09:25 · listed for about 6 h · no end time published
Trimms LanePlanned · supply quality
78 customers affected · began Wed 12 Aug, 14:54 · listed for about 1 h 30 min · no end time published
CreaghPlanned · network upgrade
39 customers affected · began Wed 12 Aug, 11:33 · listed for about 5 h · no end time published
AthenryPlanned · supply quality
13 customers affected · began Wed 12 Aug, 11:30 · listed for about 1 h · no end time published
AthenryPlanned · supply quality
51 customers affected · began Wed 12 Aug, 11:02 · listed for about 5 h · no end time published
CloonPlanned · supply quality
10 customers affected · began Wed 12 Aug, 10:37 · scheduled until 16:00 (5 h 23 min)
OughterardPlanned · supply quality
123 customers affected · began Wed 12 Aug, 10:16 · listed for about 3 h 30 min · no end time published
CarraroePlanned · supply quality
72 customers affected · began Wed 12 Aug, 09:54 · scheduled until 18:00 (8 h 6 min)
ClifdenPlanned · supply quality
42 customers affected · began Wed 12 Aug, 09:27 · listed for about 6 h · no end time published
SalthillPlanned · supply quality
93 customers affected · began Tue 11 Aug, 13:52 · scheduled until 17:00 (3 h 8 min)
CreaghPlanned
81 customers affected · began Tue 11 Aug, 12:49 · listed for about 3 h · no end time published
CurraPlanned · network upgrade
61 customers affected · began Tue 11 Aug, 09:49 · scheduled until 16:30 (6 h 41 min)
ClaregalwayPlanned · supply quality
18 customers affected · began Tue 11 Aug, 09:31 · listed for about 7 h 30 min · no end time published
GlenamaddyFault
10 customers affected · began Tue 11 Aug, 09:23 · restored 18:35 (9 h 12 min) · 3 h 20 min later than ESB estimated
RecessPlanned · supply quality
27 customers affected · began Tue 11 Aug, 08:34 · listed for about 6 h · no end time published
AthenryFault
71 customers affected · began Mon 10 Aug, 14:24 · restored 16:15 (1 h 51 min)
SalthillPlanned · supply quality
162 customers affected · began Mon 10 Aug, 11:30 · listed for about 4 h · no end time published
BallycrossaunFault
68 customers affected · began Mon 10 Aug, 10:41 · restored 16:08 (5 h 27 min) · 52 min earlier than ESB estimated
OughterardPlanned · supply quality
50 customers affected · began Mon 10 Aug, 10:03 · scheduled until 18:00 (7 h 57 min)
ClaregalwayPlanned · supply quality
35 customers affected · began Mon 10 Aug, 09:33 · listed for about 5 h · no end time published
BallycrossaunFault
32 customers affected · began Mon 10 Aug, 09:07 · off for about 7 h · no restore time published
ClifdenPlanned · supply quality
368 customers affected · began Mon 10 Aug, 08:44 · listed for about 8 h 30 min · no end time published
CreaghFault
1,027 customers affected · began Mon 10 Aug, 05:28 · restored 06:54 (1 h 26 min) · 1 h 6 min earlier than ESB estimated
Repeat fault - outage 2 of 2 at this location in quick succession
CreaghFault
1,027 customers affected · began Mon 10 Aug, 04:46 · restored 05:27 (41 min) · 33 min earlier than ESB estimated
Repeat fault - outage 1 of 2 at this location in quick succession
GlenamaddyFault
150 customers affected · began Sun 9 Aug, 19:05 · restored 22:26 (3 h 21 min) · 1 h 41 min later than ESB estimated
GlenamaddyFault
150 customers affected · began Sun 9 Aug, 07:12 · restored 09:27 (2 h 15 min) · 12 min later than ESB estimated
ClaregalwayPlanned · new connections
15 customers affected · began Sat 8 Aug, 11:31 · listed for about 3 h · no end time published
GortFault
249 customers affected · began Sat 8 Aug, 04:22 · restored 11:12 (6 h 50 min) · 2 h 42 min later than ESB estimated
- Outage began · 138 customers
- 249 customers still off
- Supply restored
ScreebFault
127 customers affected · began Fri 7 Aug, 18:16 · restored 19:16 (1 h) · 44 min earlier than ESB estimated
ParkmorePlanned
131 customers affected · began Fri 7 Aug, 17:39 · listed for about 1 h · no end time published
ParkmorePlanned
12 customers affected · began Fri 7 Aug, 17:38 · listed for about 1 h · no end time published
ClaregalwayPlanned · supply quality
54 customers affected · began Fri 7 Aug, 11:17 · listed for about 5 h · no end time published
GortPlanned · new connections
29 customers affected · began Fri 7 Aug, 10:29 · listed for about 2 h · no end time published
CarraroePlanned · supply quality
75 customers affected · began Fri 7 Aug, 10:26 · scheduled until 15:00 (4 h 34 min)
ScreebPlanned · supply quality
94 customers affected · began Fri 7 Aug, 09:41 · listed for about 3 h · no end time published
ScreebPlanned · supply quality
147 customers affected · began Fri 7 Aug, 09:14 · listed for about 5 h 30 min · no end time published
ScreebPlanned · supply quality
20 customers affected · began Fri 7 Aug, 09:10 · scheduled until 18:00 (8 h 50 min)
ClaregalwayFault
10 customers affected · began Thu 6 Aug, 17:41 · restored 18:40 (59 min) · 2 h 20 min earlier than ESB estimated
CarraroePlanned · new connections
102 customers affected · began Thu 6 Aug, 11:49 · listed for about 2 h · no end time published
CarraroePlanned · supply quality
14 customers affected · began Thu 6 Aug, 10:55 · listed for about 4 h 30 min · no end time published
ClaregalwayPlanned · new connections
67 customers affected · began Thu 6 Aug, 10:47 · listed for about 4 h 30 min · no end time published
LoughreaPlanned · line diversion
218 customers affected · began Thu 6 Aug, 10:26 · listed for about 4 h 30 min · no end time published
SpiddalPlanned · supply quality
167 customers affected · began Thu 6 Aug, 09:50 · listed for about 7 h · no end time published
ScreebPlanned · supply quality
39 customers affected · began Thu 6 Aug, 09:10 · listed for about 6 h 30 min · no end time published
ClaregalwayFault
17 customers affected · began Thu 6 Aug, 09:06 · restored 18:46 (9 h 40 min) · 44 min earlier than ESB estimated
WestportFault
25 customers affected · began Wed 5 Aug, 12:58 · restored 14:13 (1 h 15 min) · 47 min earlier than ESB estimated
CreaghPlanned
138 customers affected · began Wed 5 Aug, 11:03 · listed for about 4 h · no end time published
RecessPlanned
24 customers affected · began Wed 5 Aug, 10:14 · listed for about 5 h 30 min · no end time published
RecessPlanned · supply quality
118 customers affected · began Wed 5 Aug, 09:24 · listed for about 7 h · no end time published
CarraroeFault
26 customers affected · began Wed 5 Aug, 08:26 · restored 17:14 (8 h 48 min) · 14 min later than ESB estimated
CarraroeFault
222 customers affected · began Wed 5 Aug, 02:26 · restored 15:28 (13 h 2 min) · 1 h 32 min earlier than ESB estimated
- Outage began · 222 customers
- 12 customers still off
- Supply restored
ScreebFault
139 customers affected · began Tue 4 Aug, 19:05 · restored 20:39 (1 h 34 min) · 21 min earlier than ESB estimated
BanagherFault
17 customers affected · began Tue 4 Aug, 16:13 · restored 17:57 (1 h 44 min) · 33 min earlier than ESB estimated
ScreebFault
85 customers affected · began Tue 4 Aug, 13:03 · restored 22:04 (9 h 1 min)
CreaghPlanned · network upgrade
17 customers affected · began Tue 4 Aug, 11:45 · listed for about 2 h 30 min · no end time published
LoughreaPlanned · line diversion
25 customers affected · began Tue 4 Aug, 10:36 · listed for about 4 h · no end time published
SalthillPlanned · supply quality
181 customers affected · began Tue 4 Aug, 10:15 · listed for about 7 h · no end time published
GlenamaddyFault
72 customers affected · began Tue 4 Aug, 09:40 · restored 12:28 (2 h 48 min) · 58 min later than ESB estimated
ScreebPlanned · supply quality
63 customers affected · began Tue 4 Aug, 09:23 · listed for about 7 h 30 min · no end time published
WestportFault
25 customers affected · began Tue 4 Aug, 09:10 · restored 14:27 (5 h 17 min) · 1 h 57 min later than ESB estimated
RecessPlanned · supply quality
20 customers affected · began Tue 4 Aug, 09:06 · listed for about 6 h · no end time published
RecessFault
17 customers affected · began Tue 4 Aug, 07:43 · restored 12:13 (4 h 30 min) · 1 h 28 min later than ESB estimated
ScreebFault
17 customers affected · began Tue 4 Aug, 05:43 · restored 10:09 (4 h 26 min) · 1 h 6 min earlier than ESB estimated
ScreebFault
47 customers affected · began Tue 4 Aug, 05:24 · restored 09:11 (3 h 47 min)
ScreebFault
24 customers affected · began Tue 4 Aug, 05:05 · expected back by 07:45 (about 2 h 30 min) · no restore time published
RecessFault
5,621 customers affected · began Tue 4 Aug, 04:58 · expected back by 06:00 (about 1 h) · no restore time published
ScreebFault
49 customers affected · began Tue 4 Aug, 04:53 · restored 09:10 (4 h 17 min) · 5 min earlier than ESB estimated
GlenamaddyFault
82 customers affected · began Tue 4 Aug, 02:47 · restored 09:42 (6 h 55 min) · 4 h 57 min later than ESB estimated
Tuam NorthFault
641 customers affected · began Mon 3 Aug, 15:46 · restored 16:36 (50 min) · 24 min earlier than ESB estimated
HeadfordFault
15 customers affected · began Mon 3 Aug, 11:37 · restored 13:30 (1 h 53 min)
SpiddalFault
59 customers affected · began Mon 3 Aug, 08:40 · restored 16:30 (7 h 50 min)
KilcolganFault
2,899 customers affected · began Mon 3 Aug, 07:59 · restored 10:18 (2 h 19 min) · 57 min earlier than ESB estimated
OranmoreFault
1,730 customers affected · began Mon 3 Aug, 07:59 · restored 10:51 (2 h 52 min) · 24 min earlier than ESB estimated
- Outage began · 1,730 customers
- 200 customers still off
- Supply restored
KilcolganFault
24 customers affected · began Sun 2 Aug, 12:35 · restored 13:32 (57 min) · 58 min earlier than ESB estimated
CreaghFault
85 customers affected · began Sat 1 Aug, 20:42 · restored 22:26 (1 h 44 min) · 19 min earlier than ESB estimated
AthenryFault
120 customers affected · began Sat 1 Aug, 19:56 · restored 21:13 (1 h 17 min) · 17 min earlier than ESB estimated
GortFault
920 customers affected · began Sat 1 Aug, 19:40 · restored 19:56 (16 min) · 49 min earlier than ESB estimated
GortFault
13 customers affected · began Sat 1 Aug, 08:16 · restored 10:29 (2 h 13 min) · 3 h 1 min earlier than ESB estimated