ManorhamiltonPlanned · network upgrade
146 customers affected · began Tue 10 Nov, 11:33 · listed for about 3 h 30 min · no end time published
ManorhamiltonPlanned · supply quality
37 customers affected · began Fri 6 Nov, 11:15 · listed for about 4 h 30 min · no end time published
MohillPlanned · supply quality
115 customers affected · began Fri 6 Nov, 09:50 · listed for about 4 h · no end time published
Carrick On ShannonPlanned · supply quality
121 customers affected · began Thu 5 Nov, 10:07 · listed for about 5 h · no end time published
MohillPlanned · supply quality
83 customers affected · began Wed 4 Nov, 09:46 · listed for about 3 h 30 min · no end time published
ManorhamiltonPlanned · supply quality
43 customers affected · began Tue 3 Nov, 11:04 · listed for about 4 h 30 min · no end time published
MohillPlanned · supply quality
21 customers affected · began Tue 3 Nov, 09:48 · listed for about 2 h 30 min · no end time published
MohillPlanned · supply quality
33 customers affected · began Mon 2 Nov, 14:06 · listed for about 1 h 30 min · no end time published
ManorhamiltonPlanned · supply quality
84 customers affected · began Mon 2 Nov, 11:22 · scheduled until 17:30 (6 h 8 min) · still listed when last checked
MohillPlanned · supply quality
33 customers affected · began Mon 2 Nov, 10:35 · listed for about 1 h 30 min · no end time published
CarrigallenFault
39 customers affected · began Sat 31 Oct, 23:40 · restored Sun 1 Nov, 10:20 (10 h 40 min) · 20 min later than ESB estimated
CarrigallenFault
39 customers affected · began Sat 31 Oct, 13:25 · restored 16:23 (2 h 58 min) · 23 min later than ESB estimated
BundoranFault
104 customers affected · began Fri 30 Oct, 10:20 · restored 15:15 (4 h 55 min) · 3 h later than ESB estimated
- Outage began · 80 customers
- 104 customers still off
- Supply restored
BundoranPlanned
31 customers affected · began Fri 30 Oct, 10:05 · scheduled until 15:30 (5 h 25 min)
ArignaPlanned · new connections
74 customers affected · began Fri 30 Oct, 09:16 · listed for about 6 h · no end time published
BundoranFault
104 customers affected · began Fri 30 Oct, 06:05 · off for about 2 h · no restore time published
- Outage began · 80 customers
- 104 customers still off
- Last seen still out
BundoranFault
105 customers affected · began Fri 30 Oct, 06:03 · restored 08:05 (2 h 2 min) · 1 h 10 min earlier than ESB estimated
ManorhamiltonFault
71 customers affected · began Fri 30 Oct, 00:40 · restored 16:01 (15 h 21 min) · 2 h 44 min earlier than ESB estimated
MohillPlanned · supply quality
25 customers affected · began Thu 29 Oct, 10:11 · listed for about 5 h · no end time published
Carrick On ShannonPlanned · supply quality
93 customers affected · began Wed 28 Oct, 10:12 · listed for about 6 h · no end time published
MohillPlanned · supply quality
11 customers affected · began Wed 28 Oct, 10:10 · listed for about 5 h 30 min · no end time published
ManorhamiltonFault
15 customers affected · began Mon 26 Oct, 12:36 · restored 18:39 (6 h 3 min) · 3 h 24 min later than ESB estimated
ManorhamiltonFault
141 customers affected · began Sun 25 Oct, 14:15 · restored 17:47 (3 h 32 min) · 2 h 13 min earlier than ESB estimated
ManorhamiltonFault
18 customers affected · began Sun 25 Oct, 11:50 · restored Mon 26 Oct, 18:39 (30 h 49 min) · 22 h 39 min later than ESB estimated
ManorhamiltonFault
84 customers affected · began Sun 25 Oct, 10:42 · off for about 3 h 30 min · no restore time published
Carrick On ShannonFault
73 customers affected · began Sun 25 Oct, 10:17 · restored 15:21 (5 h 4 min) · 4 h 39 min earlier than ESB estimated
ManorhamiltonFault
26 customers affected · began Sun 25 Oct, 08:23 · restored Mon 26 Oct, 18:39 (34 h 16 min) · 4 h 9 min later than ESB estimated
ManorhamiltonFault
14 customers affected · began Sun 25 Oct, 06:57 · restored 17:53 (10 h 56 min) · 2 h 7 min earlier than ESB estimated
ManorhamiltonFault
267 customers affected · began Sun 25 Oct, 06:34 · restored 16:03 (9 h 29 min) · 3 h 57 min earlier than ESB estimated
- Outage began · 267 customers
3 further updates
- 43 customers still off
- 253 customers still off
- 84 customers still off
- Supply restored
ArignaFault
195 customers affected · began Sun 25 Oct, 06:30 · restored 16:05 (9 h 35 min) · 25 min earlier than ESB estimated
- Outage began · 39 customers
- 195 customers still off
- Supply restored
ManorhamiltonFault
71 customers affected · began Sun 25 Oct, 06:14 · restored 14:53 (8 h 39 min) · 5 h 7 min earlier than ESB estimated
- Outage began · 71 customers
- 25 customers still off
- Supply restored
ManorhamiltonFault
23 customers affected · began Sun 25 Oct, 05:11 · restored 12:08 (6 h 57 min) · 7 h 52 min earlier than ESB estimated
- Outage began · 14 customers
- 23 customers still off
- Supply restored
ArignaFault
551 customers affected · began Sun 25 Oct, 01:04 · restored 10:03 (9 h 59 min) · 3 h 57 min earlier than ESB estimated
Repeat fault - outage 2 of 2 at this location in quick succession
ArignaFault
551 customers affected · began Sun 25 Oct, 00:44 · restored 01:03 (19 min) · 13 h 57 min earlier than ESB estimated
Repeat fault - outage 1 of 2 at this location in quick succession
ArignaFault
261 customers affected · began Sun 25 Oct, 00:05 · restored 10:06 (11 h 1 min) · 3 h 54 min earlier than ESB estimated
ManorhamiltonFault
141 customers affected · began Sat 24 Oct, 22:10 · restored Sun 25 Oct, 13:59 (16 h 49 min) · 6 h 1 min earlier than ESB estimated
Carrick On ShannonPlanned · line diversion
45 customers affected · began Fri 23 Oct, 10:49 · listed for about 3 h 30 min · no end time published
ArignaFault
34 customers affected · began Thu 22 Oct, 21:13 · restored 23:11 (1 h 58 min) · 34 min earlier than ESB estimated
- Outage began · 22 customers
- 34 customers still off
- Supply restored
ManorhamiltonPlanned · supply quality
25 customers affected · began Wed 21 Oct, 10:58 · listed for about 4 h 30 min · no end time published
BundoranPlanned · new connections
10 customers affected · began Wed 21 Oct, 09:37 · listed for about 5 h 30 min · no end time published
ArignaFault
1,065 customers affected · began Wed 21 Oct, 06:09 · restored 08:22 (2 h 13 min) · 1 h 8 min earlier than ESB estimated
ArignaFault
1,084 customers affected · began Wed 21 Oct, 04:48 · restored 09:12 (4 h 24 min) · 1 h 18 min earlier than ESB estimated
- Outage began · 1,084 customers
- 19 customers still off
- Supply restored
MohillPlanned · new connections
24 customers affected · began Tue 20 Oct, 09:46 · listed for about 3 h 30 min · no end time published
ArignaFault
11 customers affected · began Mon 19 Oct, 19:42 · restored 22:50 (3 h 8 min) · 50 min later than ESB estimated
Carrick On ShannonPlanned · supply quality
12 customers affected · began Fri 16 Oct, 10:06 · scheduled until 16:00 (5 h 54 min)
MohillPlanned · supply quality
122 customers affected · began Fri 16 Oct, 09:20 · listed for about 3 h · no end time published
Carrick On ShannonPlanned · supply quality
26 customers affected · began Thu 15 Oct, 10:50 · listed for about 5 h 30 min · no end time published
ManorhamiltonPlanned · new connections
34 customers affected · began Wed 14 Oct, 10:29 · listed for about 4 h 30 min · no end time published
MohillPlanned · line diversion
49 customers affected · began Wed 14 Oct, 10:24 · listed for about 4 h 30 min · no end time published
ArignaFault
47 customers affected · began Wed 14 Oct, 10:11 · restored 18:47 (8 h 36 min) · 58 min earlier than ESB estimated
Carrick On ShannonFault
131 customers affected · began Tue 13 Oct, 17:39 · restored Wed 14 Oct, 00:06 (6 h 27 min) · 3 h 36 min later than ESB estimated
ManorhamiltonFault
16 customers affected · began Tue 13 Oct, 11:36 · restored 15:33 (3 h 57 min) · 57 min earlier than ESB estimated
ArignaPlanned · new connections
75 customers affected · began Tue 13 Oct, 11:15 · listed for about 3 h 30 min · no end time published
MohillPlanned · supply quality
269 customers affected · began Tue 13 Oct, 10:31 · listed for about 3 h · no end time published
MohillPlanned · network upgrade
45 customers affected · began Mon 12 Oct, 10:12 · listed for about 3 h 30 min · no end time published
CollooneyPlanned · network upgrade
35 customers affected · began Mon 12 Oct, 10:10 · listed for about 6 h · no end time published
ArignaFault
10 customers affected · began Sat 10 Oct, 08:35 · restored 12:36 (4 h 1 min) · 2 h 21 min later than ESB estimated
MohillPlanned · supply quality
15 customers affected · began Wed 7 Oct, 11:43 · listed for about 1 h 30 min · no end time published
Carrick On ShannonPlanned · new connections
29 customers affected · began Wed 7 Oct, 11:29 · listed for about 5 h · no end time published
ArignaPlanned · supply quality
10 customers affected · began Tue 6 Oct, 10:06 · listed for about 2 h · no end time published
MohillFault
17 customers affected · began Tue 6 Oct, 08:01 · restored 08:58 (57 min) · 1 h 17 min earlier than ESB estimated
ManorhamiltonFault
489 customers affected · began Mon 5 Oct, 22:55 · restored 23:03 (8 min) · 57 min earlier than ESB estimated
ManorhamiltonFault
242 customers affected · began Mon 5 Oct, 22:54 · restored 23:04 (10 min) · 56 min earlier than ESB estimated
ManorhamiltonFault
188 customers affected · began Mon 5 Oct, 18:20 · restored 22:51 (4 h 31 min) · 3 h 21 min later than ESB estimated
- Outage began · 188 customers
- 39 customers still off
- Supply restored
ManorhamiltonFault
23 customers affected · began Mon 5 Oct, 17:38 · off for about 30 min · no restore time published
ManorhamiltonFault
430 customers affected · began Mon 5 Oct, 17:26 · restored 22:55 (5 h 29 min) · 3 h 25 min later than ESB estimated
ManorhamiltonPlanned · new connections
71 customers affected · began Mon 5 Oct, 11:12 · listed for about 5 h 30 min · no end time published
ManorhamiltonFault
15 customers affected · began Fri 2 Oct, 18:02 · restored 22:18 (4 h 16 min) · 1 h 42 min earlier than ESB estimated
CarrigallenFault
25 customers affected · began Fri 2 Oct, 16:15 · restored 18:45 (2 h 30 min) · 15 min later than ESB estimated
ManorhamiltonFault
99 customers affected · began Fri 2 Oct, 12:45 · restored 18:06 (5 h 21 min) · 54 min earlier than ESB estimated
ManorhamiltonPlanned · supply quality
17 customers affected · began Fri 2 Oct, 11:28 · listed for about 5 h · no end time published
BundoranFault
598 customers affected · began Wed 30 Sep, 00:06 · restored 09:23 (9 h 17 min)
BundoranFault
45 customers affected · began Tue 29 Sep, 21:33 · restored 23:36 (2 h 3 min) · 51 min later than ESB estimated
MohillFault
86 customers affected · began Tue 29 Sep, 18:25 · expected back by 22:00 (about 3 h 30 min) · no restore time published
- Outage began · 57 customers
- 86 customers still off
- Estimated restore, from ESB
MohillFault
83 customers affected · began Mon 28 Sep, 16:01 · restored 19:10 (3 h 9 min) · 1 h 50 min earlier than ESB estimated
CarrigallenFault
77 customers affected · began Sun 27 Sep, 18:37 · restored Mon 28 Sep, 13:16 (18 h 39 min) · 24 h 44 min earlier than ESB estimated
MohillFault
58 customers affected · began Sun 27 Sep, 08:06 · restored 09:23 (1 h 17 min) · 8 min later than ESB estimated
ManorhamiltonFault
100 customers affected · began Thu 24 Sep, 17:05 · restored 19:14 (2 h 9 min) · 16 min earlier than ESB estimated
MohillFault
168 customers affected · began Wed 23 Sep, 16:05 · restored 17:57 (1 h 52 min) · 18 min earlier than ESB estimated
MohillPlanned · supply quality
85 customers affected · began Tue 22 Sep, 10:13 · listed for about 6 h · no end time published
Carrick On ShannonPlanned · supply quality
43 customers affected · began Tue 22 Sep, 09:51 · listed for about 4 h 30 min · no end time published
CarrigallenFault
16 customers affected · began Sun 20 Sep, 14:19 · restored 19:01 (4 h 42 min) · 29 min earlier than ESB estimated
ArignaFault
29 customers affected · began Thu 17 Sep, 17:02 · restored 18:26 (1 h 24 min) · 1 h 19 min earlier than ESB estimated
ArignaFault
17 customers affected · began Wed 16 Sep, 11:36 · restored 12:06 (30 min) · 1 h 9 min earlier than ESB estimated
BundoranFault
25 customers affected · began Tue 15 Sep, 01:31 · restored 08:06 (6 h 35 min)
BundoranFault
332 customers affected · began Tue 15 Sep, 01:24 · off for about 6 h 30 min · no restore time published
ArignaPlanned · supply quality
17 customers affected · began Mon 14 Sep, 11:06 · listed for about 3 h 30 min · no end time published
MohillFault
41 customers affected · began Sun 13 Sep, 08:21 · restored 10:31 (2 h 10 min) · 14 min earlier than ESB estimated
ArignaFault
27 customers affected · began Fri 11 Sep, 23:20 · restored Sat 12 Sep, 10:12 (10 h 52 min) · 48 min earlier than ESB estimated
ManorhamiltonPlanned · supply quality
86 customers affected · began Fri 11 Sep, 12:10 · listed for about 4 h 30 min · no end time published
ArignaPlanned · supply quality
17 customers affected · began Fri 11 Sep, 10:13 · listed for about 4 h 30 min · no end time published
CarrigallenPlanned · supply quality
22 customers affected · began Fri 11 Sep, 09:28 · listed for about 2 h 30 min · no end time published
CarrigallenFault
59 customers affected · began Fri 11 Sep, 07:48 · restored 10:09 (2 h 21 min) · 9 min later than ESB estimated
ArignaFault
27 customers affected · began Fri 11 Sep, 05:23 · restored 08:32 (3 h 9 min)
MohillFault
72 customers affected · began Thu 10 Sep, 16:10 · restored 19:23 (3 h 13 min) · 1 h 8 min later than ESB estimated
MohillFault
168 customers affected · began Thu 10 Sep, 13:57 · restored 15:57 (2 h) · 33 min earlier than ESB estimated
ManorhamiltonPlanned · new connections
27 customers affected · began Thu 10 Sep, 10:20 · listed for about 5 h · no end time published
BundoranPlanned · supply quality
18 customers affected · began Thu 10 Sep, 10:05 · listed for about 1 h 30 min · no end time published
CarrigallenPlanned · supply quality
30 customers affected · began Thu 10 Sep, 09:38 · listed for about 3 h · no end time published
ManorhamiltonPlanned · new connections
18 customers affected · began Tue 8 Sep, 10:42 · listed for about 5 h 30 min · no end time published
MohillPlanned · supply quality
37 customers affected · began Tue 8 Sep, 10:09 · listed for about 6 h 30 min · no end time published
MohillPlanned · supply quality
50 customers affected · began Tue 8 Sep, 09:43 · listed for about 1 h 30 min · no end time published
ArignaFault
15 customers affected · began Mon 7 Sep, 16:12 · restored 19:34 (3 h 22 min) · 2 h 11 min earlier than ESB estimated
ArignaPlanned · new connections
67 customers affected · began Mon 7 Sep, 09:51 · listed for about 5 h 30 min · no end time published
ArignaFault
68 customers affected · began Sat 5 Sep, 09:22 · restored 12:29 (3 h 7 min) · 1 h 31 min earlier than ESB estimated
ManorhamiltonFault
591 customers affected · began Fri 4 Sep, 22:04 · restored Sat 5 Sep, 00:00 (1 h 56 min)
- Outage began · 591 customers
2 further updates
- 152 customers still off
- 56 customers still off
- Supply restored
MohillFault
57 customers affected · began Fri 4 Sep, 15:17 · restored 18:23 (3 h 6 min) · 38 min later than ESB estimated
MohillPlanned · supply quality
103 customers affected · began Fri 4 Sep, 10:07 · listed for about 3 h 30 min · no end time published
ArignaFault
90 customers affected · began Thu 3 Sep, 10:33 · restored 12:31 (1 h 58 min) · 14 min earlier than ESB estimated
Carrick On ShannonPlanned · supply quality
247 customers affected · began Thu 3 Sep, 09:37 · listed for about 4 h · no end time published
MohillFault
10 customers affected · began Mon 31 Aug, 20:35 · restored 23:00 (2 h 25 min) · 2 h earlier than ESB estimated
Carrick On ShannonPlanned · new connections
63 customers affected · began Mon 31 Aug, 10:47 · listed for about 2 h · no end time published
BundoranFault
27 customers affected · began Mon 31 Aug, 06:17 · restored 13:06 (6 h 49 min) · 1 h 6 min later than ESB estimated
- Outage began · 14 customers
- 27 customers still off
- Supply restored
RooskyFault
13 customers affected · began Sat 29 Aug, 10:02 · restored 15:11 (5 h 9 min) · 2 h 11 min later than ESB estimated
CarrigallenFault
777 customers affected · began Fri 28 Aug, 09:10 · off for about 1 h · no restore time published
RooskyFault
100 customers affected · began Fri 28 Aug, 07:39 · restored 19:04 (11 h 25 min) · 6 h 4 min later than ESB estimated
ArignaPlanned · supply quality
34 customers affected · began Tue 25 Aug, 10:40 · listed for about 4 h · no end time published
MohillFault
10 customers affected · began Sat 22 Aug, 18:03 · restored 20:40 (2 h 37 min) · 5 min earlier than ESB estimated
ArignaFault
11 customers affected · began Sat 22 Aug, 07:37 · restored 10:59 (3 h 22 min) · 1 h 14 min later than ESB estimated
ArignaPlanned · network upgrade
208 customers affected · began Fri 21 Aug, 12:33 · listed for about 1 h 30 min · no end time published
CarrigallenFault
20 customers affected · began Thu 20 Aug, 21:41 · restored Fri 21 Aug, 00:29 (2 h 48 min) · 14 min later than ESB estimated
RooskyFault
100 customers affected · began Thu 20 Aug, 15:18 · restored 19:05 (3 h 47 min) · 1 h 5 min later than ESB estimated
ManorhamiltonFault
32 customers affected · began Wed 19 Aug, 22:37 · restored Thu 20 Aug, 02:30 (3 h 53 min) · 1 h 45 min later than ESB estimated
ArignaFault
21 customers affected · began Wed 19 Aug, 18:20 · restored 21:22 (3 h 2 min) · 52 min later than ESB estimated
ArignaFault
21 customers affected · began Wed 19 Aug, 09:16 · restored 11:11 (1 h 55 min) · 19 min earlier than ESB estimated
ArignaFault
45 customers affected · began Wed 19 Aug, 03:12 · restored 07:30 (4 h 18 min) · 1 h earlier than ESB estimated
- Outage began · 21 customers
- 45 customers still off
- Supply restored
ManorhamiltonFault
14 customers affected · began Tue 18 Aug, 19:56 · restored 21:30 (1 h 34 min) · 30 min earlier than ESB estimated
Repeat fault - outage 2 of 2 at this location in quick succession
ManorhamiltonFault
14 customers affected · began Tue 18 Aug, 19:46 · restored 19:48 (2 min) · 2 h 12 min earlier than ESB estimated
Repeat fault - outage 1 of 2 at this location in quick succession
BundoranPlanned · supply quality
53 customers affected · began Tue 18 Aug, 10:22 · listed for about 2 h 30 min · no end time published
ManorhamiltonFault
14 customers affected · began Mon 17 Aug, 19:55 · restored Tue 18 Aug, 01:57 (6 h 2 min) · 3 h 42 min later than ESB estimated
- Outage began · 14 customers
- 13 customers still off
- Supply restored
BundoranFault
27 customers affected · began Mon 17 Aug, 19:38 · restored 23:29 (3 h 51 min) · 1 h 44 min later than ESB estimated
MohillFault
41 customers affected · began Mon 17 Aug, 13:24 · restored 17:28 (4 h 4 min) · 1 h 2 min earlier than ESB estimated
ArignaPlanned · new connections
19 customers affected · began Mon 17 Aug, 10:37 · listed for about 5 h · no end time published
ManorhamiltonFault
57 customers affected · began Mon 17 Aug, 09:40 · restored 20:10 (10 h 30 min) · 1 h 10 min later than ESB estimated
ManorhamiltonFault
14 customers affected · began Sun 16 Aug, 14:46 · restored 19:15 (4 h 29 min) · 1 h 15 min earlier than ESB estimated
ArignaFault
11 customers affected · began Sat 15 Aug, 21:57 · restored Sun 16 Aug, 00:09 (2 h 12 min) · 9 min later than ESB estimated
MohillFault
168 customers affected · began Sat 15 Aug, 20:46 · restored 22:56 (2 h 10 min)
ManorhamiltonFault
54 customers affected · began Sat 15 Aug, 14:49 · restored 18:00 (3 h 11 min) · 45 min later than ESB estimated
ManorhamiltonPlanned · new connections
51 customers affected · began Thu 13 Aug, 11:43 · listed for about 3 h 30 min · no end time published
ManorhamiltonFault
31 customers affected · began Wed 12 Aug, 19:41 · restored 22:34 (2 h 53 min) · 34 min later than ESB estimated
MohillFault
21 customers affected · began Mon 10 Aug, 12:54 · expected back by 15:45 (about 3 h) · no restore time published
ArignaFault
21 customers affected · began Mon 10 Aug, 08:44 · restored 12:02 (3 h 18 min) · 1 h 2 min later than ESB estimated
ArignaFault
45 customers affected · began Mon 10 Aug, 05:52 · restored 08:33 (2 h 41 min) · 27 min earlier than ESB estimated
ManorhamiltonPlanned · supply quality
12 customers affected · began Fri 7 Aug, 10:11 · scheduled until 17:00 (6 h 49 min)
MohillPlanned · new connections
36 customers affected · began Fri 7 Aug, 10:04 · listed for about 3 h · no end time published
CarrigallenPlanned · supply quality
102 customers affected · began Wed 5 Aug, 09:52 · listed for about 3 h 30 min · no end time published
ManorhamiltonFault
71 customers affected · began Tue 4 Aug, 08:22 · restored 11:27 (3 h 5 min) · 57 min later than ESB estimated
ManorhamiltonFault
70 customers affected · began Tue 4 Aug, 07:55 · restored 09:53 (1 h 58 min) · 22 min earlier than ESB estimated